3rd Sem, Textile Design Diploma

36336: Fabric Manufacture – I Practical Textile Design 3rd Sem Syllabus for Diploma TNDTE M Scheme

Fabric Manufacture – I Practical detail TNDTE Diploma syllabus for Textile Technology (Textile Design And Weaving) (TDW), M scheme is extracted from TNDTE official website and presented for diploma students. The course code (36336), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other textile design 3rd sem syllabus for diploma m scheme tndte you can visit Textile Design 3rd Sem Syllabus for Diploma M Scheme TNDTE Subjects. The detail syllabus for fabric manufacture – i practical is as follows.

Rationale:

To enhance the practical knowledge in weaving preparatory processes like cone winding, pirn winding, warping and sectional warping. To dismantle and assemble the various parts in plain power loom. The timing and settings also given for better understanding of each mechanism. These fundamentals help the students to acquire knowledge in automatic and shuttleless weaving machines.

Guidelines:

  • All the twelve experiments given in the list of experiments should be completed and given for the semester practical examination.
  • In order tdevelop best skills every students should be provided with a separate machine for each mechanism for better understanding in the laboratory.
  • The external examiners are requested tensure that a single experimental question should not be given tmore than twstudents while examining a batch of 30 students during Board Examinations.

Question Paper Pattern &Allocation Of Marks

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

Objectives:

Cone Winding

  • ToDraw the Passage of material.
  • TSet the Slub catcher and Tensioner for specific counts.
  • Tcalculate the drum shaft speed and Production per drum per hour in kgs. Pirn Winding
  • ToDraw the Passage of material.
  • Tcalculate the spindle speed and Production per spindle per hour in kgs.
  • Tdraw the bunch building mechanism .

Sectional Warping

  • TDraw the Passage of material.Tcalculate the Production per hour in kgs.
  • Tdraw the gearing plan.

Shedding

  • TDismantle and assemble the various parts of the Tappet shedding mechanism with timing and settings.

Picking

  • TDismantle and assemble the various parts of the Cone over pick mechanism with timing and settings.
  • TDismantle and assemble the various parts of the Under pick mechanism with timing and settings.

Take-up

  • TDismantle and assemble the various parts of the 7 wheel take-up motion with timing and settings. .

Let-off

  • TDismantle and assemble the various parts of the negative let-off mechanism with back rest settings.

Auxiliary Motions

  • TDismantle and assemble the various parts of the loose reed / fast reed mechanism with timing and settings.
  • TDismantle and assemble the various parts of the weft fork mechanism with timing and settings.

Shuttle box

  • TDismantle and assemble the various parts of the shuttle box of an over pick loom with reed alignment for the given shuttle.

Drawing & Denting

  • Tdraw the warp yarn through heald shaft and reed.

List of Experiments

  1. Sketch the gearing plan of a high speed cone winder and calculate the winding speed and production per drum per hour in kg.
  2. Sketch the gearing plan of a pirn winder and calculate the spindle speed and production per spindle per hour in kg.
  3. Draw the Passage of material through a Sectional warping machine and calculate the number of sections, revolutions of each section, drum speed and beaming speed.
  4. Sketch the tappet shedding mechanism and set it for proper timing and working.
  5. Sketch the cone over pick mechanism and set it for proper timing and working.
  6. Sketch the under pick (Lever / Cone) mechanism and set it for proper timing and working.
  7. Sketch the 7 wheel take-up motion and set it for proper timing and working.
  8. Sketch the negative let-off mechanism and set it with timing and back rest settings.
  9. Sketch the Loose reed / Fast reed mechanism set it for proper timing and working.
  10. Sketch the shuttle box of an over pick loom and set it with reed alignment for the given shuttle.
  11. Sketch the Side weft-fork mechanism and set it for proper timing and working.
  12. Draw a small section of warp ends through healds and reed for weaving plain / twill cloths.

List Of Equipments Required

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

For detail syllabus of all other subjects of BE Textile Design, M scheme do visit Textile Design 3rd Sem syllabus for M scheme.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*