4th Sem, Textile Tech Diploma

36046: Fabric Manufacture – II Practical Textile Tech 4th Sem Syllabus for Diploma TNDTE M Scheme

Fabric Manufacture – II Practical detail TNDTE Diploma syllabus for Textile Technology (TX), M scheme is extracted from TNDTE official website and presented for diploma students. The course code (36046), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other textile tech 4th sem syllabus for diploma m scheme tndte you can visit Textile Tech 4th Sem Syllabus for Diploma M Scheme TNDTE Subjects. The detail syllabus for fabric manufacture – ii practical is as follows.

Rationale:

To enhance practical knowledge about the dobby, jacquard, drop box and terry mechanisms students will get hands on training by dismantling and assembling the each mechanism individually.
And also the mechanisms of automatic shuttle looms like positive let-off, cop changing, warp stop motion will be dismantled and assembled during the practical.

Objectives:

Dobby

  • To dismantle and assemble the various parts of the Dobby mechanism.
  • To set the dobby for correct working with timing and setting.
  • To peg the lattice for LH dobby for the given weaves
  • To peg the lattice for RH dobby for the given weaves

Drop box

  • To dismantle and assemble the various parts of the Drop box mechanism for correct working with timing and setting.
  • To prepare a chain of metallic cards for weaving a given pattern without card saving device in a drop box loom.
  • To prepare a chain of metallic cards for weaving a given pattern with card saving device in a drop box loom

Jacquard

  • To draw the diagram of a jacquard and to understand the working of a Jacquard mechanism with functions of various parts.
  • To draw the timing diagram of a jacquard for various actions.

Automatic loom

  • To Dismantle and assemble the various mechanisms of the automatic loom with timing and settings.

Loom and fabric calculations

  • To study about the Quality particulars of Commercial Fabrics like Long Cloth, Casement,
  • Cambric, Voile, Mull and Poplin.
  • To Calculate and understand the Cost of fabric per meter for the given Striped / Checked fabric

Guidelines:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

Question Paper Pattern & Allocation Of Marks

Single experiment is to be given per student

  • Experiment 50 marks
  • Write up / diagram / calculations 20 marks
  • Viva 05 marks

Total 75 Marks

List Of Equipments

  • Dobby loom – 1 no
  • Jacquard loom – 1 no
  • Terry loom – 1 no
  • Drop box loom – 1 no
  • Automatic loom – 1 no

Specific Instructions To Carry Out In The Practical Class Work As Well As The Board Practical Examinations

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

Safety Precautions To Be Followed

The students while doing the experiments,

  1. Should wear safe foot wear, preferably shoes.
  2. Should keep their shirts tucked in.
  3. Should do settings on the machines only after the mains supply is switched off.
  4. Should inform the staff in charge immediately if they find any unsafe condition in the machine.
  5. Should not wear loose shirts.
  6. Should not open the doors and covers while the machine is running.
  7. Should not start running a machine without doing regular safety checks, closing the safety doors and in the absence of the teacher.

List Of Experiments

  1. Setting the Dobby mechanism for correct working with timing.
  2. Pegging the lattice for LH dobby for the given weaves: Honey Comb and Mock Leno.
  3. Pegging the lattice for RH dobby for the given weaves: Huck-a-back and Herring Bone Twill
  4. Setting the Drop box mechanism for correct working with timing.
  5. Preparation of a chain of metallic cards for weaving a given pattern without card saving device in a drop box loom.
  6. Preparation of a chain of metallic cards for weaving a given pattern with card saving device in a drop box loom.
  7. Setting the Jacquard mechanism for correct working with timing.
  8. Setting the Terry mechanism for correct working with timing.
  9. Setting the Mechanical weft feeler in cop changing mechanism for correct working with timing
  10. Setting the Cop changing mechanism for correct working with timing.
  11. Setting the Warp stop motion for correct working with timing.
  12. Setting the Positive let-off motion for correct working with timing.

For detail syllabus of all other subjects of BE Textile Tech, M scheme do visit Textile Tech 4th Sem syllabus for M scheme.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*