6th Sem, Architectural Asst Diploma

31267: Project Work Architectural Asst 6th Sem Syllabus for Diploma TNDTE M Scheme

Project Work detail TNDTE Diploma syllabus for Architectural Assistantship (AA), M scheme is extracted from TNDTE official website and presented for diploma students. The course code (31267), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other architectural asst 6th sem syllabus for diploma m scheme tndte you can visit Architectural Asst 6th Sem Syllabus for Diploma M Scheme TNDTE Subjects. The detail syllabus for project work is as follows.

Rationale:

Objectives:

  1. The objective of the project work is to enable the students to work inconvenient groups of not more than six members in a group on a Project involving theoretical and real studies related to Architecture.
  2. Every project Work shall have a Guide who is a member of the faculty.
  3. Five Hours per week shall be allotted in the Time table for this important activity and this time shall be utilized by the students to receive directions from the Guide, Case studies, Library reading, computer analysis , field work or model making as assigned by the Guide.
  4. Each group shall present periodical seminars in the progress made In the Project.
  5. Each student shall finally produce a comprehensive report covering the Project Work details such as Architectural Design, Working Drawing, Model and Approximate estimate of the Project and Conclusion.
  6. The continuous assessment and a final evaluation may be carried out for the award of marks.
  7. The students may be exposed to the various natural and manmade disasters they may encounter in the field of work and taught how to manage them.

Guidelines:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

Internal Assessment:

The internal assessment should be calculated based on the review of the progress of the work done by the student periodically as follows.

Detail of assessment- Period of assessment- Max. Marks

  • First Review- 6th week- 10 Marks
  • Second Review- 14th week- 10 Marks
  • Attendance- Entire semester- 5 Marks

Total- 25Marks

Evaluation For Board Examination

Details of Mark allocation Max Marks

  • Marks for Report Preparation, Demo, Viva-voce 65 Marks
  • Marks for answers of 4 questions which is to be set by the external examiner from the given question bank consisting of questions in the following two topics Disaster Management and Environmental Management. Out of four questions two questions to appear from each of the above topics i.e. 2 questions x 2 topics = 4 questions 4 questions x 2 ½ marks = 10 Marks 10 Marks
  • Total 75 Marks

Environmental & Disaster Management

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

List Of Questions

1. Environmentral Management

  1. What is the responsibility of an Engineer-in-charge of an Industry with respect to Public Health?
  2. Define Environmental Ethic.
  3. How Industries play their role in polluting the environment?
  4. What is the necessity of pollution control? What are all the different organizations you know, which deal with pollution control?
  5. List out the different types of pollutions caused by a Chemical / Textile / Leather / Automobile / Cement factory.
  6. What is meant by Hazardous waste?
  7. Define Industrial waste management.
  8. Differentiate between garbage, rubbish, refuse and trash based on their composition and source.
  9. Explain briefly how the quantity of solid waste generated in an industry could be reduced.
  10. What are the objectives of treatments of solid wastes before disposal?
  11. What are the different methods of disposal of solid wastes?
  12. Explain how the principle of recycling could be applied in the process of waste minimization.
  13. Define the term ‘Environmental Waste Audit’.
  14. List and discuss the factors pertinent to the selection of landfill site.
  15. Explain the purpose of daily cover in a sanitary landfill and state the minimum desirable depth of daily cover.
  16. Describe any two methods of converting waste into energy.
  17. What actions, a local body such as a municipality could take when the agency appointed for collecting and disposing the solid wastes fails to do the work continuously for number of days?
  18. Write a note on Characteristics of hazardous waste.
  19. What is the difference between municipal and industrial effluent ?
  20. List few of the undesirable parameters / pollutants anticipated in the effluents from oil refinery industry / thermal power plants / textile industries / woolen mills / dye industries / electroplating industries / cement plants / leather industries (any two may be asked)
  21. Explain briefly the process of Equalization and Neutralization of waste water of varying characteristics discharged from an Industry.
  22. Explain briefly the Physical treatments “Sedimentation” and “Floatation” processes in the waste water treatment.
  23. Explain briefly when and how chemical / biological treatments are given to the waste water.
  24. List the four common advanced waste water treatment processes and the pollutants they remove.
  25. Describe refractory organics and the method used to remove them from the effluent.
  26. Explain biological nitrification and de-nitrification.
  27. Describe the basic approaches to land treatment of Industrial Effluent.
  28. Describe the locations for the ultimate disposal of sludge and the treatment steps needed prior to ultimate disposal.
  29. List any five Industries, which act as the major sources for Hazardous Air Pollutants.
  30. List out the names of any three hazardous air pollutants and their effects on human health.
  31. Explain the influence of moisture, temperature and sunlight on the severity of air pollution effects on materials.
  32. Differentiate between acute and chronic health effects from Air pollution.
  33. Define the term Acid rain and explain how it occurs.
  34. Discuss briefly the causes for global warming and its consequences
  35. Suggest suitable Air pollution control devices for a few pollutants and sources.
  36. Explain how evaporative emissions and exhaust emissions are commonly controlled.
  37. What are the harmful elements present in the automobile smokes? How their presence could be controlled?
  38. What is the Advantage of Ozone layer in the atmosphere? State few reasons for its destruction.
  39. Explain the mechanism by which hearing damage occurs.
  40. List any five effects of noise other than hearing damage.
  41. Explain why impulsive noise is more dangerous than steady state noise.
  42. Explain briefly the Source – Path – Receiver concept of Noise control.
  43. Where silencers or mufflers are used ? Explain how they reduce the noise.
  44. Describe two techniques to protect the receiver from hearing loss when design / redress for noise control fail.
  45. What are the problems faced by the people residing along the side of a railway track and near to an Airport? What provisions could be made in their houses to reduce the problem?

  • Disaster Management
    1. What is meant by Disaster Management? What are the different stages of Disaster management?
    2. Differentiate Natural Disasters and Man made Disasters with examples.
    3. Describe the necessity of Risk identification and Assessment Surveys while planning a project.
    4. What is Disasters recovery and what does it mean to an Industry?
    5. What are the factors to be considered while planning the rebuilding works after a major disaster due to flood / cyclone / earthquake? (Any one may be asked)
    6. List out the public emergency services available in the state, which could be approached for help during a natural disaster.
    7. Specify the role played by an Engineer in the process of Disaster management.
    8. What is the cause for Earthquakes? How they are measured? Which parts of India are more vulnerable for frequent earthquakes?
    9. What was the cause for the Tsunami 2004 which inflicted heavy loss to life and property along the coast of Tamilnadu ? Specify its epicenter and magnitude.
    10. Specify the Earthquake Hazard Zones in which the following towns of Tamilnadu lie
      1. Chennai
      2. Nagapattinam
      3. Coimbatore
      4. Madurai
      5. Salem.
    11. Which parts of India are experiencing frequent natural calamities such as
      1. heavy rain fall
      2. huge losses due to floods
      3. severe cyclones
    12. Define basic wind speed. What will be the peak wind speed in
      1. Very high damage risk zone – A,
      2. High damage risk zone,
      3. Low damage risk zone.
    13. Specify the minimum distance from the Sea shore and minimum height above the mean sea level, desirable for the location of buildings.
    14. Explain how the topography of the site plays a role in the disasters caused by floods and cyclones.
    15. Explain how the shape and orientation of buildings could reduce the damages due to cyclones.
    16. What is a cyclone shelter ? When and where it is provided ? What are its requirements
    17. What Precautionary measures have to be taken by the authorities before opening a dam for discharging the excess water into a canal/river ?
    18. What are the causes for fire accidents ? Specify the remedial measures to be taken in buildings to avoid fire accidents.
    19. What is a fire escape in multistoried buildings ? What are its requirements ?
    20. How the imamates of a multistory building are to be evacuted in the event of a fire/Chemical spill/Toxic Air Situation/ Terrorist attack, (any one may be asked).
    21. Describe different fire fighting arrangements to be provided in an Industry.
    22. Explain the necessity of disaster warning systems in Industries.
    23. Explain how rescue operations have to be carried out in the case of collapse of buildings due to earthquake / blast / Cyclone / flood.
    24. What are the necessary steps to be taken to avoid dangerous epidemics after a flood disaster?
    25. What relief works that have to be carried out to save the lives of workers when the factory area is suddenly affected by a dangerous gas leak / sudden flooding ?
    26. What are the difficulties faced by an Industry when there is a sudden power failure? How such a situation could be managed?
    27. What are the difficulties faced by the Management when there is a group clash between the workers? How such a situation could be managed?
    28. What will be the problems faced by the management of an Industry when a worker dies because of the failure of a mechanical device due to poor maintenance? How to manage such a situation ?
    29. What precautionary measures have to be taken to avoid accidents to labourers in the Industry in a workshop / during handling of dangerous Chemicals / during construction of buildings / during the building maintenance works.
    30. Explain the necessity of medical care facilities in an Industry / Project site.
    31. Explain the necessity of proper training to the employees of Industries dealing with hazardous products, to act during disasters.
    32. What type of disaster is expected in coal mines, cotton mills, Oil refineries, ship yards and gas plants?
    33. What is meant by Emergency Plan Rehearsal? What are the advantages of such Rehearsals?
    34. What action you will take when your employees could not reach the factory site because of continuous strike by Public Transport workers?
    35. What immediate actions you will initiate when the quarters of your factory workers are suddenly flooded due to the breach in a nearly lake / dam, during heavy rain?
    36. What steps you will take to avoid a break down when the workers union of your Industry have given a strike notice?
    37. List out few possible crisis in an organization caused by its workers? What could be the part of the middle level officials in managing such crisis?
    38. What types of warning systems are available to alert the people in the case of predicted disasters, such as floods, cyclone etc.
    39. Explain the necessity of Team work in the crisis management in an Industry / Local body.
    40. What factors are to be considered while fixing compensation to the workers in the case of severe accidents causing disability / death to them?
    41. Explain the legal / financial problems the management has to face if safely measures taken by them are found to be in adequate.
    42. Describe the importance of insurance to men and machinery of an Industry dealing with dangerous jobs.
    43. What precautions have to be taken while storing explosives in a match/ fire crackers factory?
    44. What are the arrangements required for emergency rescue works in the case of Atomic Power Plants?
    45. Why residential quarters are not constructed nearer to Atomic Power Plants?

    For detail syllabus of all other subjects of BE Architectural Asst, M scheme do visit Architectural Asst 6th Sem syllabus for M scheme.

    Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    *