IPE

18IP743: Just in Time Manufacturing IPE Syllabus for BE 7th Sem 2018 Scheme VTU (Professional Elective-3)

Just in Time Manufacturing detailed Syllabus for Industrial & Production Engineering (IPE), 2018 scheme has been taken from the VTUs official website and presented for the VTU students. For Course Code, Subject Names, Teaching Department, Paper Setting Board, Theory Lectures, Tutorial, Practical/Drawing, Duration in Hours, CIE Marks, Total Marks, Credits and other information, visit full semester subjects post given below. The Syllabus PDF files can also be downloaded from the official website of the university.

For all the other VTU IPE 7th Sem Syllabus for BE 2018 Scheme, visit Industrial & Production Engineering 7th Sem 2018 Scheme.

For all the (Professional Elective-3) subjects refer to Professional Elective-3 Scheme. The detail syllabus for just in time manufacturing is as follows.

Course Learning Objectives:

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Module-1

JIT-AN INTRODUCTION: Speed of JIT movement, the new production system research association of Japan, some definitions of JIT, core Japanese practices of JIT, enabling JIT to occur, basic element of JIT, benefits of JIT. MODERN PRODUCTION SYSTEM: Key feature of Toyota’s production system, basic framework of Toyota production system. KANBAN SYSTEM – other types of kanban’s, kanban rules, determining the number of kanban’s in Toyota production system.

Module-2

PRODUCTION SMOOTHING IN TOYOTA PRODUCTION SYSTEM: production planning, production smoothing, adaptability to demand fluctuations, sequencing method for the mixed model assembly line to realize smoothed production. EDP system for support of the Toyota Production system. GLOBAL IMPLEMENTATION OF JIT: JIT in automotive industry, JIT in electronics, computer, telecommunication and instrumentation, JIT in process type industry, JIT in seasonal demand industry, other manufacturing industries, conclusion.

Module-3

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Module-4

SUPPLY MANAGEMENT FOR JIT: JIT purchasing-the Japanese way, some studies in JIT purchasing, experience of implementation organizations, surveys of JIT purchasing, buyer-seller relationship in JIT purchasing, Quality certification of suppliers in JIT purchasing, some problems in implementation of JIT purchasing, reduction freight costs in JIT purchasing, monitoring supplier performance for JIT purchasing, audit in JIT purchasing, implementation of JIT to international sourcing.

Module-5

FRAMEWORK FOR IMPLEMENTATION OF JIT: Implementation risk, risks Due to inappropriate understanding of JIT, risks due to technical, operational and people problems, risks associated with kanban system, some important activities to be performed during implementation, steps in implementation, a project work to approach to implementation, conclusion.

Course Outcomes:

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Question paper pattern:

  • The question paper will have ten full questions carrying equal marks.
  • Each full question will be for 20 marks.
  • There will be two full questions (with a maximum of four sub- questions) from each module.
  • Each full question will have sub- question covering all the topics under a module.
  • The students will have to answer five full questions, selecting one full question from each module.

Textbook:

  1. Just In Time Manufacturing M.G. Korgaonker Macmillan India Ltd.- 1992
  2. Japanese Manufacturing Techniques Richard J. Schonberger The Free Press – Macmillan Pub. Co., Inc. New York 1988

For the detail Syllabus of all other subjects of BE (IPE) 7th Sem, visit Industrial & Production Engineering 7th Sem Subjects.

For all (CBSE & Non-CBSC) BE/B.Tech results, visit VTU BE/B.Tech all semester results.

Leave a Reply

Your email address will not be published. Required fields are marked *

*