5th Sem, Textile Technology Diploma

Lab Spinning-I & II Textile Technology 5th Sem Syllabus for Diploma BTEUP 2018

Lab Spinning-I & II detail BTEUP Diploma syllabus for Textile Technology, effective from 2018, is collected from BTEUP 2017 Syllabus official website and presented for diploma students. The course details such as exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other textile technology 5th sem bteup diploma syllabus 2018 you can visit Textile Technology 5th Sem BTEUP Diploma Syllabus 2018 Subjects. The detail syllabus for lab spinning-i & ii is as follows.

SPINNING LAB I

  1. Calcualte the draft constant, twist constant, spindle speed, front roller speed and production per spindle from machine particulars in the workshop.
  2. To prepare sliver laps on the sliver lap machines and to
  3. gauge the rollers.

  4. To calculate all tensions drafts, Intermediate drafts, Total
  5. draft, Draft constant and Production of sliver lap machine.

  6. Operate the ribbon lap machine and prepare laps and gauge
  7. the rollers of the machine.

  8. To calculate all tensions drafts, Intermediate drafts, total drafts, Draft constant and Production of ribbon lap machine.
  9. To operate and set timing of comber and prepare sliver.
  10. Set and gauge various parts of comber.
  11. To calculate and analyse the comber waste percentage practically and evaluate the combing efficiency.
  12. To calculate all tension drafts, Intermideate drafts, Total drafts and Drafts constant and production of comber machine.
  13. Operate the fly frame with material and practice the piecing
  14. of roving.

  15. Set building motion and traverse motion according to hank of roving.
  16. Calculate spindle speed, front roller speed and rate of traverse from machine particulars.
  17. To Gauge the drafting rollers and to practice changing of draft change pinion (DCP), lifter change, change wheel, twist wheel, ratchet wheel and winding wheel.
  18. Level the bobbin rail and adjust the lift of fly frame.
  19. Set the spindle and bolster and footstep bearing and clean and lubricate the machine (Flyframe).
  20. To calculate production per shift of eight hours and time
  21. required to fill one can of 3000 meters sliver capacity on
    card machines

  22. Operate the drawing machine and to practice piecing of
  23. sliver.

  24. Setting and gauging of drafting rollers for given staple
  25. length of fibres.

  26. To lubricate and put the stop motion in proper working order of draw frame.
  27. To calculate the speed of different moving parts of a draw frame machine
  28. To calculate the production on draw frame per delivery per machine per shift of eight hours

SPINNING LAB II

  1. To make cheeses on parallel winding machine and calculate drum speed and production.
  2. Operate the doubling machine and produce folded yarn and to calculate twists constant, TPI, Spindle speed and production.
  3. Make hanks of yarn on reeling machine by straight reeling method and cross reeling method
  4. Make bundles of yarn on the bundling machine.
  5. To Calculation twist constant and draft constant and production from machine praticulars of ring frame.
  6. Operate the machine and produce yarn.
  7. Gauge the Spindle and Lappets.
  8. To learn the changing the draft change pinon and twist wheel, traveller and ratchet wheel at ring frames and mount the spindle tape and set it for ‘S’ and ‘Z’ twist.
  9. Set the building motion according to the count of yarn.
  10. Set the top arm and gauge the top and bottom rollers.
  11. Carryout the maintenance of ring frame practically.
  12. To calculate spindle speed , Twist Constt, TPI & Production of ring doubler.
  13. To learn about making spin plan, taking breaking study, snap study of idle spindles, labour allocation in Ring frame dept on assumption basis.
  14. To study traveller speed & doff weight of Ring frame.
  15. To calculate count cint. & strength cint. in Ring yarn on assumption basis.

For detail syllabus of all other subjects of BE Textile Technology, effective from 2018 do visit Textile Technology 5th Sem BTEUP syllabus for 2018.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*