6th Sem, Env, Poll & Con Diploma

Construction Management, Accounts and Entrepreneurship Development Env, Poll & Con 6th Sem BTEUP Syllabus 2019-2020

Construction Management, Accounts and Entrepreneurship Development detail BTEUP syllabus for Civil Engineering (Environmental Pollution & Control), effective from 2019-2020, is collected from BTEUP 2017 Syllabus official website and presented for diploma students. PDF download is possible from official site but you can download the istudy mobile app for syllabus on mobile. The course details such as exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other bteup syllabus 6th sem env, poll & con 2019-2020 you can visit BTEUP Syllabus 6th Sem Env, Poll & Con 2019-2020 Subjects. The detail syllabus for construction management, accounts and entrepreneurship development is as follows.

Rationale:

This is an applied civil engineering subject. The subject aims at imparting basic knowledge about construction planning and management, site organisation, construction labour, control of work progress, inspection and quality control, accidents & safety and accounts.

Learning Outcomes:

After undergoing the subject, students will be able to:

  • State functions of various aspects of controlling construction job/project
  • Explain pre-tender stage and contract stage
  • Prepare bar charts for simple construction work
  • Prepare scheduling techniques i.e. PERT and CPM
  • Prepare job layout of building
  • Comply with various labour laws
  • Analyze and support in effective functioning of organization
  • Inspect quality at various stages of the construction
  • Control accidents and safety concerns
  • Prepare measurement books and bill of quantities
  • Knowledge of scope and benefit of Entrepreneurship
  • Know about the various program running in India, state Govt.
  • Know about leadership qualities

CONSTRUCTION MANAGEMENT

1. Introduction (06 Periods)

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

2. Construction Planning (08 Periods)

  1. Importance of construction planning Stages of construction planning
    1. Pre-tender stage
    2. Contract stage
    3. Contracts and e-tendering

    4. Different types of contracts
    5. Penalties and Arbitration
  2. Scheduling construction works by bar charts
    1. Definition of activity, identification of activities though
    2. Preparation of bar charts for simple construction work
    3. Preparation of schedules for labour, materials, machinery and finances for small works
    4. Limitations of bar charts
  3. Scheduling by network techniques
    1. Introduction to network techniques; PERT and CPM, differences between PERT and CPM terminology

3. Organization (02 Periods)

  1. Types of organizations: Line, line and staff, functional and their characteristics

4. Site Organization (06 Periods)

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

5. Construction Labour (06 Periods)

  1. Conditions of construction workers in India, wages paid to workers
  2. Important provisions of the following Acts:
    1. Labour Welfare Fund Act 1936 (as amended)
    2. Payment of Wages Act 1936 (as amended)
    3. Minimum Wages Act 1948 (as amended)
    4. Acts relating to Labour Safety

6. Control of Progress (08 Periods)

  1. Methods of recording progress
  2. Analysis of progress
  3. Taking corrective actions keeping head office informed
  4. Cost time optimization for simple jobs – Direct and indirect cost, variation with time, cost optimization

7. Inspection and Quality Control (07 Periods)

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.

8. Accidents and Safety in Construction (08 Periods)

  1. Accidents – causes and remedies
  2. Safety measures for
    1. Excavation work
    2. Drilling and blasting
    3. Hot bituminous works
    4. Scaffolding, ladders, form work
    5. Demolitions
  3. Safety campaign and safety devices, safety training
  4. Fire safety

ACCOUNTS

9. Public Work Accounts (10 Periods)

  1. Introduction, technical sanction, allotment of funds, re-appropriation of funds bill, contractor ledger, measurement book running and final account bills complete, preparation of bill of quantities (BOQ), completion certificate & report, hand receipt, aquittance roll. Muster Roll labour, casual labour rollduties and responsibility of different cadres, budget-stores, returns, account of stock, misc. P.W. advances T & P – verification, survey report, road metal material charged direct to works, account – expenditure & revenue head, remittance and deposit head, definition of cash, precaution in custody of cash book, imprest account, temporary advance, treasury challan, preparation of final bills. Students must learn to prepare accounts register.
  2. Filling of PWD accounts forms

10. Entrepreneurship (09 Periods)

Definition and concept , role and significance, risk and awards, Requirement of an entrepreneur development, Programmes Existing in India, Forms of business enterprises, sole proprietorship-partnership-private limited- cooperatives.

Industrial legislation and taxes:

  1. GST
  2. Income Tax
  3. Excise duty
  4. Labourcess

Instructional Strategy:

This is highly practice-based course and efforts should be made to relate process of teaching with direct experiences at work sites. Participation of students should be encouraged in imparting knowledge about this subject. To achieve this objective the students should be taken to different work sites for clear conception of particular topics, such as site organization, inspection of works at various stages of construction and working of earth moving equipment

Means of Assessment:

  1. Assignments and quiz/class tests
  2. Mid-term and end-term written tests
  3. Presentations
  4. Report Writing
  5. Viva-voce

RECOMMENDED BOOKS

  1. Civil Engineering Management by Wakhlo, ON ; Light and Life Publishers, New Delhi
  2. Construction Equipment and its Planning and Application by Verma, Mahesh
  3. Management in Construction Industry by Dharwadker, PP; Oxford and IBH Publishing Company, New Delhi
  4. Construction Planning and Management by Gahlot PS; Dhir, BM; Wiley Eastern Limited, New Delhi
  5. MS Project – Microsoft USA
  6. Primavera Manual by Sh. Vinod Kumar; NITTTR, Chandigarh.
  7. e-books/e-tools/relevant software to be used as recommended by AICTE/ NITTTR, Chandigarh.

Websites for Reference:

http://swayam. gov.in

For detail syllabus of all other subjects of BE Env, Poll & Con, effective from 2019-2020 do visit Env, Poll & Con 6th Sem BTEUP syllabus for 2019-2020.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*