{"id":30560,"date":"2022-03-26T03:35:10","date_gmt":"2022-03-26T03:35:10","guid":{"rendered":"https:\/\/www.inspirenignite.com\/vtu\/government-engineering-college-gec-raichur-kcet-2021-hyd-kar-cutoff-and-fee\/"},"modified":"2022-03-26T13:41:44","modified_gmt":"2022-03-26T13:41:44","slug":"government-engineering-college-gec-raichur-kcet-2021-hyd-kar-cutoff-and-fee","status":"publish","type":"post","link":"https:\/\/www.inspirenignite.com\/vtu\/government-engineering-college-gec-raichur-kcet-2021-hyd-kar-cutoff-and-fee\/","title":{"rendered":"Government Engineering College (GEC Raichur) KCET 2021 Hyd-Kar Cutoff and Fee"},"content":{"rendered":"<p>Government Engineering College (GEC Raichur) KCET 2021 Hyd-Kar Cutoff and Fee<br \/>\nKCET 2021 cutoff and fee will give you all updated information on B.Tech closing rank in each KCET admission round of Hyderabad-Karnataka and also about the fees charged by government, private universities and affiliated institutes. Cutoff information for all seats is also collected. Please refer to <a href=\"https:\/\/www.inspirenignite.com\/vtu\/government-engineering-college-gec-raichur-kcet-2021-cutoff-and-fee-details\/\" target=\"_blank\" rel=\"noopener\">Government Engineering College (GEC Raichur) KCET 2021 Cutoff and Fee details<\/a>. To easily access cutoff information about KCET Cutoffs and closing ranks we made a college predictor tool. Do refer to the tool below.<\/p>\n<h2 class=\"ini_cat_button\"><a href=\"https:\/\/www.inspirenignite.com\/kcet-cutoff-closing-ranks-and-college-predictor\/\" target=\"_blank\" rel=\"noopener\">KCET Cutoff, Closing Ranks and College Predictor<\/a><\/h2>\n<p>The seats are divided between Karnataka and General seats for various categories ranging between General Merit, Scheduled Caste, Scheduled Tribe and various other Backward Categories. GEC Raichur is a GOVT. institute and comes under Raichur region. For cutoffs do check following information.<\/p>\n<hr \/>\n<p><a href=\"#fee\"> Fee Structure |<\/a> <a href=\"#round1\"> Cutoff Round 1 |<\/a> <a href=\"#round2\"> Cutoff Round 2 |<\/a><\/p>\n<div id=\"fee\">\n<h3>GEC Raichur Fee structure for Engineering (B.Tech) in 2021<\/h3>\n<table class=\"borderTable\">\n<tbody>\n<tr>\n<th>College Code<\/th>\n<th>College Name<\/th>\n<th>Seat Type<\/th>\n<th>GM<\/th>\n<th>OBC (2A,2B,3A,3B)<\/th>\n<th>SC\/ST (Below 10 Lakhs income)<\/th>\n<th>CAT 1 (Below 2.5 Lakhs income)<\/th>\n<th>CAT 1 (Above 2.5 Lakhs income)<\/th>\n<\/tr>\n<tr>\n<td>E162<\/td>\n<td>GEC Raichur<\/td>\n<td>NA<\/td>\n<td>NA<\/td>\n<td>NA<\/td>\n<td>NA<\/td>\n<td>NA<\/td>\n<td>NA<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div id=\"round1\">\n<hr \/>\n<p><a href=\"#fee\"> Fee Structure |<\/a> <a href=\"#round1\"> Cutoff Round 1 |<\/a> <a href=\"#round2\"> Cutoff Round 2 |<\/a><\/p>\n<h3>GEC Raichur KCET 2021 Hyd-Kar Engineering Round 1 cutoff ranks<\/h3>\n<table class=\"borderTable\">\n<tbody>\n<tr>\n<th>Course Name<\/th>\n<th>GM<\/th>\n<th>GMK<\/th>\n<th>GMR<\/th>\n<th>1G<\/th>\n<th>1K<\/th>\n<th>1R<\/th>\n<th>2AG<\/th>\n<th>2AK<\/th>\n<th>2AR<\/th>\n<th>2BG<\/th>\n<th>2BK<\/th>\n<th>2BR<\/th>\n<th>3AG<\/th>\n<th>3AK<\/th>\n<th>3AR<\/th>\n<th>3BG<\/th>\n<th>3BK<\/th>\n<th>3BR<\/th>\n<th>SCG<\/th>\n<th>SCK<\/th>\n<th>SCR<\/th>\n<th>STG<\/th>\n<th>STK<\/th>\n<th>STR<\/th>\n<\/tr>\n<tr>\n<td>CE<\/td>\n<td>87211<\/td>\n<td>98715<\/td>\n<td>106990<\/td>\n<td>98026<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>130534<\/td>\n<td>&#8212;<\/td>\n<td>163825<\/td>\n<td>117974<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>148394<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>99532<\/td>\n<td>&#8212;<\/td>\n<td>107629<\/td>\n<td>112351<\/td>\n<td>121206<\/td>\n<td>127689<\/td>\n<td>94627<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr>\n<td>CS<\/td>\n<td>37894<\/td>\n<td>37928<\/td>\n<td>42500<\/td>\n<td>47219<\/td>\n<td>&#8212;<\/td>\n<td>63090<\/td>\n<td>54915<\/td>\n<td>59281<\/td>\n<td>55024<\/td>\n<td>41667<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>45297<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>43427<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>58762<\/td>\n<td>&#8212;<\/td>\n<td>65014<\/td>\n<td>44400<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr>\n<td>EC<\/td>\n<td>66511<\/td>\n<td>73671<\/td>\n<td>75271<\/td>\n<td>67960<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>88485<\/td>\n<td>&#8212;<\/td>\n<td>94620<\/td>\n<td>81043<\/td>\n<td>&#8212;<\/td>\n<td>102385<\/td>\n<td>82042<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>76268<\/td>\n<td>90246<\/td>\n<td>&#8212;<\/td>\n<td>115009<\/td>\n<td>&#8212;<\/td>\n<td>137907<\/td>\n<td>69022<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr>\n<td>ME<\/td>\n<td>157228<\/td>\n<td>157580<\/td>\n<td>166359<\/td>\n<td>176234<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>163601<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>166511<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>174660<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>174780<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>181646<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<hr \/>\n<p><a href=\"#fee\"> Fee Structure |<\/a> <a href=\"#round1\"> Cutoff Round 1 |<\/a> <a href=\"#round2\"> Cutoff Round 2 |<\/a><\/p>\n<div id=\"round2\">\n<h3>GEC Raichur KCET 2021 Hyd-Kar Engineering Round 2 cutoff ranks<\/h3>\n<table class=\"borderTable\">\n<tbody>\n<tr>\n<th>Course Name<\/th>\n<th>GM<\/th>\n<th>GMK<\/th>\n<th>GMR<\/th>\n<th>1G<\/th>\n<th>1K<\/th>\n<th>1R<\/th>\n<th>2AG<\/th>\n<th>2AK<\/th>\n<th>2AR<\/th>\n<th>2BG<\/th>\n<th>2BK<\/th>\n<th>2BR<\/th>\n<th>3AG<\/th>\n<th>3AK<\/th>\n<th>3AR<\/th>\n<th>3BG<\/th>\n<th>3BK<\/th>\n<th>3BR<\/th>\n<th>SCG<\/th>\n<th>SCK<\/th>\n<th>SCR<\/th>\n<th>STG<\/th>\n<th>STK<\/th>\n<th>STR<\/th>\n<\/tr>\n<tr>\n<td>CE<\/td>\n<td>117974<\/td>\n<td>121206<\/td>\n<td>138531<\/td>\n<td>128418<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>179642<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>166310<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>120013<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>153544<\/td>\n<td>155271<\/td>\n<td>170944<\/td>\n<td>151810<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr>\n<td>CS<\/td>\n<td>46831<\/td>\n<td>47219<\/td>\n<td>47872<\/td>\n<td>63796<\/td>\n<td>&#8212;<\/td>\n<td>66432<\/td>\n<td>64899<\/td>\n<td>67100<\/td>\n<td>67918<\/td>\n<td>52827<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>47418<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>49642<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>86651<\/td>\n<td>&#8212;<\/td>\n<td>102509<\/td>\n<td>52672<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr>\n<td>EC<\/td>\n<td>87801<\/td>\n<td>88969<\/td>\n<td>93769<\/td>\n<td>91021<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>135579<\/td>\n<td>&#8212;<\/td>\n<td>171051<\/td>\n<td>103643<\/td>\n<td>&#8212;<\/td>\n<td>121936<\/td>\n<td>163795<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>99735<\/td>\n<td>121513<\/td>\n<td>&#8212;<\/td>\n<td>151295<\/td>\n<td>&#8212;<\/td>\n<td>174780<\/td>\n<td>91435<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<tr>\n<td>ME<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<td>&#8212;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<hr \/>\n<p><a href=\"#fee\"> Fee Structure |<\/a> <a href=\"#round1\"> Cutoff Round 1 |<\/a> <a href=\"#round2\"> Cutoff Round 2 |<\/a><\/p>\n<p>For all other institutes KCET 2021 cut offs and other information do refer to <a href=\"https:\/\/www.inspirenignite.com\/vtu\/kcet-2021-engineering-cutoffs-and-fee\/\" target=\"_blank\" rel=\"noopener\">KCET 2021 Engineering Cutoffs, Fee and Round wise Seat Matrix<\/a>. For all institutes round wise Hyd-Kar cutoff information during 2021 do refer to <a href=\"https:\/\/www.inspirenignite.com\/vtu\/kcet-2021-engineering-hyd-kar-cutoffs-and-fee\/\" target=\"_blank\" rel=\"noopener\">KCET 2021 Engineering Hyd-Kar Cutoffs, Fee and Round wise Seat Matrix<\/a>. For Questions you can either comment here or ask on InI forum at <a href=\"https:\/\/www.inspirenignite.com\/forums\/\" target=\"_blank\" rel=\"noopener\"> Ask a Question<\/a>.<\/p>\n<p>For regular updates on MCA and other exams do like us on Facebook, follow us on Google Plus and subscribe to feed for email updates.<\/p>\n<p>Dont forget to share with friends.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Government Engineering College (GEC Raichur) KCET 2021 Hyd-Kar Cutoff and Fee KCET 2021 cutoff and fee will give you all updated information on B.Tech closing rank in each KCET admission [&hellip;]<\/p>\n","protected":false},"author":2298,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[23],"tags":[],"class_list":["post-30560","post","type-post","status-publish","format-standard","hentry","category-kcet-cutoff"],"_links":{"self":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts\/30560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/users\/2298"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/comments?post=30560"}],"version-history":[{"count":1,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts\/30560\/revisions"}],"predecessor-version":[{"id":30902,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts\/30560\/revisions\/30902"}],"wp:attachment":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/media?parent=30560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/categories?post=30560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/tags?post=30560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}