{"id":10312,"date":"2020-02-21T16:19:39","date_gmt":"2020-02-21T16:19:39","guid":{"rendered":"https:\/\/www.inspirenignite.com\/vtu\/15en65p-extensive-survey-project-envi-6th-sem-syllabus-for-diploma-dte-karnataka-c15-scheme\/"},"modified":"2020-02-21T16:19:39","modified_gmt":"2020-02-21T16:19:39","slug":"15en65p-extensive-survey-project-envi-6th-sem-syllabus-for-diploma-dte-karnataka-c15-scheme","status":"publish","type":"post","link":"https:\/\/www.inspirenignite.com\/vtu\/15en65p-extensive-survey-project-envi-6th-sem-syllabus-for-diploma-dte-karnataka-c15-scheme\/","title":{"rendered":"15EN65P: Extensive Survey Project Envi 6th Sem Syllabus for Diploma DTE Karnataka C15 Scheme"},"content":{"rendered":"<p>Extensive Survey Project detail DTE Kar Diploma syllabus for Civil (Environmental Engg) (EN), C15 scheme is extracted from <a href=\"http:\/\/dte.kar.nic.in\/obe11.shtml\/\" target=\"_blank\" rel=\"noopener\">DTE Karnataka<\/a> official website and presented for diploma students. The course code (15EN65P), and for exam duration, Teaching Hr\/week, Practical Hr\/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.<\/p>\n<p>For all other envi 6th sem syllabus for diploma c15 scheme dte karnataka you can visit <a href=\"..\/envi-6th-sem-syllabus-for-diploma-c15-scheme-dte-karnataka\">Envi 6th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects<\/a>. The detail syllabus for extensive survey project is as follows.<\/p>\n<p><h4>Pre-requisites:<\/h4>\n<p>Knowledge of Surveying, Estimation, Water supply and sanitary engineering.\n<\/p>\n<p><h4>Course Objectives:<\/h4>\n<p>Extensive Survey shall be conducted on the Water Supply &amp; Sanitary Scheme<\/p>\n<ol>\n<li>Capacity of small reservoir.<\/li>\n<li>New Water supply and Sewerage system for a colony or village<\/li>\n<\/ol>\n<p><h4>Course Outcomes:<\/h4>\n<p><b>For complete syllabus and results, class timetable and more pls <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\" target=\"_blank\" rel=\"noopener\">download iStudy Syllabus App<\/a>.<\/b> Its a light weight, easy to use, no images, no pdfs platform to make students life easier.<\/p>\n<p><h4>Major topics:<\/h4>\n<ol>\n<li>Introduction<\/li>\n<li>Reconnaissance Survey<\/li>\n<li>Preliminary Surveys<\/li>\n<li>Engineering Survey<\/li>\n<li>Location Survey<\/li>\n<li>Preparation of drawings.<\/li>\n<li>Tracing and inking of Drawings<\/li>\n<li>Filing and submission of drawings<\/li>\n<\/ol>\n<p><h4>Graded Exercises:<\/h4>\n<p><b>Capacity of small reservoir.<\/b><\/p>\n<ol>\n<li>Fly levelling to establish B.M from any available G.T.S B.M. to the site.<\/li>\n<li>Fixing alignment of the bund<\/li>\n<li>Conduct profile levelling along the centre line of bund (L.S &amp; C.S) with respect to GTS BM<\/li>\n<li>Conduct contour survey to calculate the capacity of small reservoir.<\/li>\n<\/ol>\n<p><b>New Water supply and Sewerage system for a colony or village<\/b><\/p>\n<ol>\n<li>Collection of data required to prepare plan of a village or colony.<\/li>\n<li>Preparation of detailed layout plan of the colony or village.<\/li>\n<li>Conduct detail survey of block levelling to prepare interpolated contour maps of the given colony or village.<\/li>\n<li>Conduct profile levelling for proposed water supply\/ sewerage system.<\/li>\n<li>Fixing position of Over head tank in the proposed area.<\/li>\n<li>Prepare the Abstract Estimate for proposed Water supply and Sewerage system of a colony or village<\/li>\n<\/ol>\n<p><b>Drawings to be prepared:<\/b><\/p>\n<ol>\n<li>Plan showing the alignment of Bund.<\/li>\n<li>Plotting of L.S. and C.S of Bund.<\/li>\n<li>Contour map of water spread.<\/li>\n<li>Preparation of proposed village map\/layout<\/li>\n<li>Preparation of Village or colony base map with interpolated contour maps<\/li>\n<li>Preparation of detailed drawings from the surveying data for water supply scheme.<\/li>\n<li>Preparation of detailed drawings from the surveying data for surface drain or under<\/li>\n<p>Ground drainage (UGD) system.\n<\/ol>\n<\/p>\n<p><h4>Reference Books:<\/h4>\n<p><b>For complete syllabus and results, class timetable and more pls <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\" target=\"_blank\" rel=\"noopener\">download iStudy Syllabus App<\/a>.<\/b> Its a light weight, easy to use, no images, no pdfs platform to make students life easier.<\/p>\n<p><h4>Suggested List of Student Activities:<\/h4>\n<\/p>\n<p><i>Note: Following is the list of proposed student activities such as (5 marks for CIE)<\/i><br \/>\nEach student should submit report on any one of the following visits.<\/p>\n<ol>\n<li><\/li>\n<li><\/li>\n<li><\/li>\n<li><\/li>\n<li><\/li>\n<li><\/li>\n<li><\/li>\n<li><\/li>\n<\/ol>\n<p><h4>Course Delivery:<\/h4>\n<p>The course will be delivered through lectures, Demonstration and practices.\n<\/p>\n<p>For detail syllabus of all other subjects of BE Envi, C15 scheme do visit <a href=\"..\/category\/environmental-engg-diploma+6th-sem\">Envi 6th Sem syllabus for C15 scheme<\/a>.<\/p>\n<p>Dont forget to <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\" target=\"_blank\" rel=\"noopener\">download iStudy Syllabus App<\/a> for latest syllabus and results, class timetable and more.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Extensive Survey Project detail DTE Kar Diploma syllabus for Civil (Environmental Engg) (EN), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code [&hellip;]<\/p>\n","protected":false},"author":2298,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[19,59],"tags":[],"class_list":["post-10312","post","type-post","status-publish","format-standard","hentry","category-6th-sem","category-environmental-engg-diploma"],"_links":{"self":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts\/10312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/users\/2298"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/comments?post=10312"}],"version-history":[{"count":0,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/posts\/10312\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/media?parent=10312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/categories?post=10312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/vtu\/wp-json\/wp\/v2\/tags?post=10312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}