Estimating and Costing. detail DTE Kar Diploma syllabus for Interior Decoration (ID), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15ID52T), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.
For all other interior 5th sem syllabus for diploma c15 scheme dte karnataka you can visit Interior 5th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for estimating and costing. is as follows.
Pre-requisites:
Mathematics, knowledge of materials of construction and Architectural/Interior Drawing.
Course Objectives:
- Apply the principles of estimating for all types of old and new works and estimate the cost of construction of interior works, furniture items, fittings and finishes for a project.
- Distinguish specifications for various items of works in interiors.
- Analyze from first principle, the rates of various interior works of a building.
- Propose detailed cost estimate of a proposed interior with specification.
Course Outcomes:
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
UNIT 1: Introduction to estimation 6 Hrs
- Principles of estimating for all types of new and old works and methods of estimating of quantities.
- Method of deduction for openings.
- Units of measurement -Cubic meter, Square meter, Running meter, etc.
- Data collection of specification of market prices of materials and products required in interior works.
- Task or turnout work for different interior works.
UNIT 2: Specification 8 Hrs
- Partition walls – using prelaminated sheet, glass with aluminum sections.
- Plastering with cement mortar.
- Wooden flooring.
- Vitrified tiled flooring.
- Vinyl Flooring.
- Marble flooring.
- Plastic emulsion painting.
- Wood work for doors, windows.
- Painting and polishing for wood work.
- False ceiling using thermocol with aluminum sections.
- Wall paneling.
UNIT 3: Analysis of rates 12 Hrs
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
UNIT 4: Detailed estimate 26 Hrs
- Prepare the detailed estimate of quantities and abstract estimate ofcost for a given building with specification for each item of work.
- All types of interior works like partition, wall paneling, false ceiling, providing of furniture, cabinets, painting, flooring, dadoing etc.in residential and commercial buildings.
- A single room with R.C.C roof with or without partition wall of brick above plinth level.
- Remodeling of existing residence and commercial building with additions and alterations.
- Furniture items like wooden table, chair, teapoy, upholstered seating, dining table etc.
- Water supply and sanitary fittings inside a building (excluding water supply sanitary connections).
- Produce the detailed estimate in a spread sheet.
Text Books:
- Estimating and Costing in Civil Engineering – B.N. Datta
- Estimating and Costing in Civil Engineering – M. Chakraborti
- Estimating and Costing in Civil Engineering – S.C. Rangwala
- Estimating and Costing in Civil Engineering – Mahajan
- Estimating and Costing in Civil Engineering – P.L. Bhasin
- Estimating and Costing in Civil Engineering – V.N. Vazirani and S.P. Chandola
- Techniques for Estimating Materials, Costs and Time for Interior Designers – Carol Sampson
- Estimating and Costing for Interior Designers – Diana Allison A Step-by-Step Workbook
Web links
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
SUGGESTED STUDENT ACTIVITIES:
- To conduct market survey and to collect specifications of building materials and fittings and fixtures (water supply, sanitary and hardware) along with rates.
- To collect specifications forfinished interior furnitures along with rates.
- To prepare estimate of interior works for an existing building and submit the same.
Execution Note:
- Maximum of 4 students in each batch for student activity
- Any two activities (either from the list given or any similar activities) shall be assigned among different batches may be assigned by the teacher based on interest of the students.
- Project activities shall be carried out throughout the semester and present the project report at the end of the semester; concerned teacher is expected to observe and record the progress of students’ activities.
- Submit qualitative hand-written report not exceeding 6 pages; one report per batch.
- Each of the activity can be carried out off-class well in advance; however, demonstration/presentation should be done during class sessions.
- Assessment shall be based on quality of work as prescribed by the table.
Course Delivery:
- The course will be delivered through lectures and Power point presentations/ Video and site visits.
- Teachers can encourage the students to take case study and make the report of the same.
Model Question Paper:
PART A
- Write the units for any five of the following items: 5×1= 5
- Burn brick masonry in CM 1:4.
- Mangalore tiled roofing.
- Granite flooring.
- Wood work in frames.
- Plastering
- M S grill work
- Aluminum partition wall
- Wall paneling
PART B
- Write detailedspecification of plastering with cement mortar. 10
- Write detail specification for Wood work for doors and windows. 10
OR
Write detailedspecification for false ceiling using thermocole with aluminum sections.
PART C
- Analyze from first principle the rate for any three of the following items of work.3×10 =30
- False ceiling using plaster of paris and GI sections.
- Supplying and fixing European type W.C. pan.
- Cladding for internal walls using polished granite.
- Supplying and fixing European type W.C. pan with cistern.
- Fully paneled single leaf wooden door.
PART D
- Prepare a detailed estimate and abstract for residential building shown in figure 1 for any three items. 3×15=45
- First class brick masonry in cement mortar 1:6.
- Dadoing in kitchen.
- Ceiling plastering.
- Wardrobe for the bed room.
- Wall paneling for the living room.
For detail syllabus of all other subjects of BE Interior, C15 scheme do visit Interior 5th Sem syllabus for C15 scheme.
Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.