Estimating and Costing detail DTE Kar Diploma syllabus for Civil Engineering (Public Health Engg) (PH), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15EN52T), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.
For all other public health 5th sem syllabus for diploma c15 scheme dte karnataka you can visit Public Health 5th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for estimating and costing is as follows.
Pre-requisites:
Knowledge of basic Mathematics, Materials of construction, Building planning, and drawing.
Course Objectives:
It aims at understanding the detailed specifications of Materials and analyzing the probable cost of civil engineering structures.
Course Outcomes:
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
1. INTRODUCTION TO ESTIMATION
Introduction to estimating: Different items of works and types of estimates Units of measurements and units of payment of different items of work. Different methods of taking out quantities – centre line method and long short wall method. 03
2. SPECIFICATIONS:
Detailed specifications for
- Earthwork in foundation
- Cement concrete in foundation
- Brick masonry
- Ashlar masonry
- R.C.C roof slab
- Plastering in Cement mortar
- Pointing with cement mortar,
- Cement concrete flooring
- Distempering
- Laying of water supply line/ sanitary line. 07
3. ANALYSIS OF RATE :
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
4. DETAILED AND ABSTRACT ESTIMATE OF BUILDINGS 14
Prepare the detailed estimate and abstract estimate of
- Two room building
- Residential building – 1BHK/2BHK with flat RCC roof
- School building single storied with flat RCC roof.
5. DETAILED AND ABSTRACT ESTIMATE SANITARY STRUCTURES
Prepare the detailed estimate and abstract estimate of
- Manhole
- Septic tank
- Soak pit
- Underground water tank(sump tank.
6. DETAILED AND ABSTRACT ESTIMATE OF WATER SUPPLY & SANITARY CONNECTIONS IN BUILDING
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
Suggested List of Student Activities:
Note: the following activities or similar activities for assessing CIE (IA) for 5 marks (Any one)
- Each student should do any one of the following type activity or any other similar activity related to the course and before conduction, get it approved from concerned Course coordinator and Program coordinator.
- Eachstudent should conduct different activity and no repeating should occur.
- Detailed estimation for the following activities should be prepared using MS Excel and conclude through presentation/seminar.
- Prepare the detailed estimate of rain water harvesting for one block of your Institution Or any other site oriented civil engineering work.
- Prepare the detailed estimate of Hospital building
- Prepare the detailed estimate of pitched roof building
- Estimate the total quantity of course aggregates, fine aggregates & Steel required for a beams & slab of a residential building.
- Estimate the total quantity of timber required for Door, window and also list usual fittings required.
- Estimate the total quantity of timber required for Furniture.
- Estimate the cost to construct tube well for total depth of 90m.
- Estimate the cost of constructing UGD for a lay out
- Prepare detailed Estimate for electrification for ground floor building.
- Estimate the total quantity of ply wood, laminates, and fixtures, required for Furniture work.
Course Delivery:
- The course will be delivered through lectures and Power point presentations/ Video
Model Question Paper:
(CIE)
- What is an Estimate? State the purpose of estimation . 5 MARKS
- Distinguish between Revised estimate and Supplementary estimate. . 5 MARKS
- List the specifications for brick work in C.M. (1:6)
- List the specifications for RCC roof slab for CC (1:1^:3) M20 concrete
OR Evaluate the rate analysis for bed concrete CC (1:3:6) M10 for foundation. 10 MARKS
Reference Books:
- Estimating and costing By B. N. Datta.
- Estimating and costing By M. Chakraborti.
- Estimating and costing By S. C. Rangwala.
- Estimating and costing By G. S. Birdie.
- Estimating and costing By V. N. Vazirani and S.P.Chandola.
Model Question Paper:
(SEE)
PART-A
- What is the purpose of preparation of an estimate?
- Distinguish between Revised estimate and Supplementary estimate.
- Explain the method of taking out the quantities by long wall & short wall method and centre line method.
- List the units of measurements of the following items:
- Brick masonry
- RCC roof
- Outside plastering
- Painting to doors & windows
- Weather proof course.
- Explain the specifications for the Bed concrete in C.C (1:3:6) for foundation.
- Explain the specifications for the Plastering in C.M (1:6) for internal walls.
- Explain are the specifications for the 20mm Granite flooring over C C Bed
- Explain the purpose of rates Analyses of Engineering works
- State the principles of Estimation and costing.
PART -B
(Section I)
- Prepare detailed and abstract estimate for the any THREE items of the building as shown in fig 1 (by any method)
- Earthwork excavation in foundation
- Size stone masonry in C.M (1:6) for foundation
- I class Burnt brick masonry in C.M (1:6) for superstructure.
- Vitrified Flooring
(Section II)
- Prepare detailed and abstract estimate for the any TWO items of the Septic tank shown in fig.2 by using prevailingDSR rates for
- Earthwork excavation in foundation
- Bed concrete
- Burnt brick masonry in C.M (1:6).
(Section III)
Answer any two Questions
- Prepare the detailed and abstract estimation of Plumbing work for sanitary connection for the given building shown in fig.1
- Formulate the rate analysis for cement concrete (1:3:6) for foundation.
- Formulate the rate analysis for 12mm thick plastering with CM (1:3).