5th Sem, EE Diploma

15EE57P: Estimation Simulation Lab Electrical 5th Sem Syllabus for Diploma DTE Karnataka C15 Scheme

Estimation Simulation Lab detail DTE Kar Diploma syllabus for Electrical And Electronics Engineering (EE), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15EE57P), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other electrical 5th sem syllabus for diploma c15 scheme dte karnataka you can visit Electrical 5th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for estimation simulation lab is as follows.

Pre-requisites:

Knowledge about-Analog and Digital Electronics, Concepts of power
circuit and control circuits, working principle of electric motors and their applications, working principles of transformers and their ratings, circuit breakers, isolators, switches.

Course Objectives:

To know the components used in Domestic wirings, erection of towers and substations. To provide systematic training on drawings of Single-Line Diagrams of Towers, Substations and prepare materials required.

Course Outcomes:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

LIST OF GRADED EXERCISES:

  1. Design an Electrical Installation for the Residential building.
    • Total Connected lighting load is 800 Watts.
    • (Refer the Layout plan for load segregation).

    • Electrical pole is 10 Mtrs away from the building.

    Generate a Single Line diagram for the above electrical Installation mentioning the cable sizes (1ph+N+PE), protection devices used at the Mains.
    Calculate the size of the Over head Aluminum cable required and generate the complete bill of Materials

  2. Design an Electrical Installation for the Residential building with AEH Connection for the given load matrix.
  3. [Location Light Fan 5 A socket 15 A socket]

    1. Front verandah 1 1
    2. Drawing room 1 1 2 1
    3. Dining room 1 2 1
    4. Bed room 1 1 1
    5. Kitchen 1 1 1
    6. Bath room 1 1
    7. Generate the electrical network and show distinctly the various sub circuits on the installation plan; calculate the size of the wire required for each sub circuits.
      Calculate the size of the cable required in Under Ground system and Generate the complete bill of Materials

  4. Design an Electrical network for the Workshop with the following loads.
    1. 1 No. drilling machine: 3 Ph, 440V, 1 Hp
    2. 2 Nos. Lathes: 3 Ph, 440V, 2 Hp each
    3. 1 No. Grinding machine: 3 Ph, 440V, 1 Hp
    4. 1 No. Milling machine: 3 Ph, 440V, 10 Hp ( Refer the Layout plan for the position of machines)
    5. Assume the power factor as 0.8 and the efficiency of the machines are 85% with DOL starters.
      Calculate the size of the cables used in each motor feeder section along with its protection devices. Generate the complete bill of materials and segregate feeder wise.

  5. Hostel building in a Polytechnic has 3 floors. The First and Second Floors are similar to Ground Floor and there are 20 Rooms and 14 bathrooms /Toilets in each floor.
    • Each room is having 2 Light points, One Fan point and One 5 Amps socket point.
    • Each bathroom/Toilet has One Light point.
    • Common room in each floor has 4 Light points, 2 Fan points and 2 Nos of 5 Amps Socket outlet.
    • Corridor and Stair case has 11 Light points for each floor.
    • Ground floor has 8 Outdoor lighting points.
    • Design an Electrical Network for the hostel building, indicating the ratings of each protection devices used at the Mains and at the Switchboard level. 12

  6. Size the Service Mains cable for the Exercise 4 06
  7. A small factory having 3 phase four wire 415 volts supply comprises of the following:
    • Sixty lightings points in the factory of 100 watts each
    • One 8 kW motor with 0.8 p.f and four 8 kW motors with 0.7 p.f
    • 15 lighting points in the office of 150 watts each
    • 5 heating points in the office with 2 kW load on each outlet
    • Six socket outlets in the office for 0.5 kW motor.
    • Prepare a schematic diagram along with the sub-circuit arrangement and control equipments. 06

  8. Consider an industrial site having 3 phase four wire 415 volts supply, comprises of the following load groups
    • Load group 1: 3 phase four wire; total 450 kW power with 0.8 p.f
    • Load group 2: 3 phase four wire; total 100 kW power with 0.7 p.f The engineer is asked to maintain a unity power factor at the Main Low voltage 12 switch board.
    • Calculate the rating of the compensation capacitor (kVAR) required. Realize the schematic and find the order & type of capacitor required.

  9. Pump house is having 2 No. of 5 H.P. Irrigation pump sets with Individual Star Delta starters is located adjacent to well Distance between the Electrical Pole and Pump house is 5 Meters and The pump is 10 Meters away from the Motor starter located in Pump house. Calculate the size of the Mains cable connecting the Mains and Motor starters. Also design the ratings of the Starters (OLRs) and the contactors (Y-A). Specify also the cable sizes required to connect Pump and Starters. Draw the Electrical schematics network . 06
  10. Calculate the rating of the compensation capacitor (kVAR) required to improve the Power factor to Unity for the exercise
  11. Realize the schematic and find the order & type of capacitor required 06
  12. New polytechnic campus is given 60KW load. New 100KVA Transformer is to be installed 100mts away from the campus. Prepare materials required for installing new 100KVA transformer. Generate the electrical network and show distinctly the various sub circuits on the installation plan. Calculate the size of the underground cable required in Under Ground system from 100KVA transformer to college campus and Generate the complete bill of Materials 06

e-Resources: Any available open-source simulation software.

Any available open-source simulation software like

My Ecodial L 3.4
Or
Ecodial Advance International 4.X

http://www.schneider-electric.com/en/product-category/5100-software/?filter=business-4-low-voltage-products-and-systems

Course Delivery:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

Tutorial – 1Hr:

Staff-in-charge will;

  1. Explain the components used in simulation software.
  2. Ask the students to draw the Single-line diagram manually.
  3. Guide the students to draw the Single-line diagram using simulation software.

Conduction/ Execution- 2 Hr:

Each student must draw the Single-line diagram using simulation software and generate the complete bill of Materials

Suggested Student Activity (any one to be submitted with 3 pages report):

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

Scheme of Valuation for SEE (Semester End Examination):

  1. Design and generate bill of materials for the given exercise 30
  2. Results 10
  3. Viva-Voce 10

Estimation Simulation Lab Equipments Requirement:

  1. Computers with latest configuration 20 NOs.
  2. Estimation simulations Related software’s 10 NOs.
  3. Printers 20NOs.

For detail syllabus of all other subjects of BE Electrical, C15 scheme do visit Electrical 5th Sem syllabus for C15 scheme.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.