6th Sem, Civil Diploma

15CE62T: Project Management and Valuation Civil 6th Sem Syllabus for Diploma DTE Karnataka C15 Scheme

Project Management and Valuation detail DTE Kar Diploma syllabus for Civil Engineering (General) (CE), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15CE62T), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other civil 6th sem syllabus for diploma c15 scheme dte karnataka you can visit Civil 6th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for project management and valuation is as follows.

Pre-requisites:

Knowledge of Construction Technology and Estimation and Costing.

Course Objectives:

  1. Able to understand the organisation structure in construction industries.
  2. Know the activities of the project and schedule it effectively considering the duration with resources available, organising efficiently for successful completion of the project.
  3. Know the process of tendering in contracts and procedure followed in the project of a construction industry
  4. Know the Quality control, Safety aspects and Store management of a construction project.
  5. To know the qualities of an entrepreneur.
  6. Perform the valuation of buildings.

Course Outcomes:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

1. INTRODUCTION TO PROJECT MANAGEMENT:

Project Management, Professional Construction Management-Significance, objectives & functions of construction management, Classification, stages in construction. Interpersonal Behaviour in Project Organizations of construction team, Perception of- Owner, Engineer & Contractor, Job layouts, Organisation chart. Resources for construction-Men, Machine, Materials, Money & Time Management, Turnkey operation, Project Feasibility. BOT, BOOT, PPP. 10

2. PLANNING & SCHEDULING PLANNING-

Objective, principles, advantages, analysis, limitation and stages of planning for construction projects. SCHEDULING – Necessity of scheduling, Preparation of construction schedule for labour, material, machine & finance. NETWORK ANALYSIS-Introduction to network techniques, Interrelationship of events, activities.-Bar chart, Analysis of CPM, PERT with simple problems, Indentifying critical activities and critical path. Scheduling software applications. 10

3. CONSTRUCTION PROJECT PRACTICES –

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

4. SAFETY AND QUALITY MANAGEMENT ACCIDENTS-

definition of accident terms: (Partial & total disablement, Injury frequency rate, injury severity rate). Accident- Causes, Precaution & Prevention. SAFETY- Importance of safety. Safety procedures and check list (excavation, scaffolding, form work) Safety meetings, Safety measures for storage, handling of building material and execution. TQM-Introduction, Importance & Functions of total quality management in construction industry, Tools for quality control, Elements and requirements of quality management. Aims and ways of TQM. BIS certification of quality system, 10

5. VALUATION OF BUILDINGS-

Definition, Methods of valuation, purpose and factors governing valuation. Scrap value, Salvage value, Market value, Book value and sinking fund. Calculation of depreciation by different methods. Rental value based on plinth area method & Rent fixation. Valuation of old buildings. 05

6. ENTERPRENEURSHIP

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

Course Delivery:

The course will be delivered through lectures and Power point presentations/ Video, demonstrations etc.

SUGGESTED ACTIVITIES

The topic should be related to the course in order to enhance his knowledge, practical skill & and lifelong learning, communication, modern tool usage.

  1. Visit any nearby construction site & interact with the construction team regarding type of structure & its organisation structure.
  2. Visit any contractor and interact about the present tendering process (e-tendering) and awarding of contract.
  3. Collection of tender notices published in newspapers for various items of civil engineering works (at least 5) write salient features of them.
  4. Prepare a planning schedule for the nearby on going construction activity with the help of available open source project management software.
  5. Visit any nearby PWD/PERD /KIARDL/KHB office or any construction company, collect the documents (BOQ, M B, Tender, SR, lead statement) related to the project and prepare report on it.
  6. Collect quality management standards pertaining to ISO 9001, ISO 14001 & OHSAS 18001 & prepare a report.
  7. Drafting a tender notice for construction of a civil engineering work (W. B. M. Road, residential is building).
  8. Preparation of tender document for the building.(detailed estimate prepared for R.C.C. building in estimating and costing shall be used )
  9. Collection of various account forms from PWD & Prepare a report on it.
  10. Prepare a report on store procedure and account producer of PWD. (For it a Guest lecture of PWD official to be arranged)
  11. Prepare detailed specifications for the following:
    1. Building construction system.
    2. Irrigation engineering system.
    3. Transportation engineering system.
    4. Environment engineering system.
  12. Study the application of CPM & PERT technique in planning software.
  13. Prepare a report on women entrepreneurship, rural entrepreneurship, agri-preneurship.
  14. Collect the various entrepreneurship development programs.
  15. Collect the details required for getting a contract license from corporation and prepare a report on it.
  16. Make a case study on valuation of a existing building.
  17. Collect safety procedures (Do’s and Dont’s) of each and every construction activities.
  18. Collect or Prepare the various stages of inspection and quality control for construction activities

NOTE:

  1. Guest lectures to be arranged by inviting engineers from PWD or from construction industry.
  2. Students should select any one of the above or other topics relevant to the subject approved by the concerned faculty, individually or in a group of 3to 5
  3. Students should mandatorily submit a written report and make a presentation on the topic. The task should not be repeated among students.
  4. Report will be evaluated by the faculty. Weightage for 5 marks Internal Assessment shall be as follows:
  5. Unsatisfactory 1, Developing 2, Satisfactory 3, Good 4, Exemplary 5

  6. Reports should be made available along with bluebooks to IA verification officer

Model Question Paper:

FOR CIE

  1. List any five objectives of construction management (or) What is Job lay out? Mention the factors affecting Job layout.
  2. What are the necessity of scheduling in construction project?
  3. Explain Project Feasibility.
  4. Draw a network diagram for the following , B follows A, C follows A, D and E follows B, F follows C and D, G follows E and F. Determine the critical path for the network diagram if the duration of activities A,B,C,D,E,F and G are 2,6,3,1,6,3 and 6 days respectively. Find the Critical path.

Note: Internal choice may be given in each CO at the same cognitive level (CL).

Text Books:

  1. Sanga Reddy. S, “Construction Management”,Kumaran Publications, Coimbatore.
  2. Rangwala.S.C.,”Construction of Structures and Management of Works”, Charotar Publishing House,Anand-388001,3rd Edition,2000.
  3. Construction management by NITTTR, Chennai.
  4. Chitkara, “Construction Project Management”, Mc Graw Hill Publications,
  5. Construction Management – Prof Dhir, Eastren Publications.
  6. Estimating and costing By B. N. Datta.
  7. Entrepreneurial development -Dr.S.S.Khanka by S.Chand publishers

Model Question Paper:

Part -A

Answer any six questions of the following, each question carries 5 marks

  1. What is construction management? What is its significance?
  2. What is Job Layout? Write the Job Layout for construction of a Multi storey building.
  3. Explain BOT.
  4. Prepare a Material schedule for any project.
  5. List the requirements to be furnished in contract agreement.
  6. What is Site order book? Write the specimen of a site order book.
  7. Write the functions of Total Quality management in a Construction industry.
  8. What are the purpose and factors governing valuation?
  9. Write note on Entreprenual motivation.

Part -B

Answer any seven questions from the following. (Question no4 & no10 are compulsory)
Each question carries 10 marks.

  1. What is Construction organisation? Write the Organisation chart for a Multi storey building project.
  2. What is Construction Scheduling? Explain CPM & PERT with example.
  3. Briefly explain the Stages of a construction project.
  4. Draw a network diagram for the following , B follows A, C follows A, D and E follows B, F follows C and D, G follows E and F. Determine the critical path for the network diagram if the duration of activities A,B,C,D,E,F and G are 2,6,3,1,6,3 and 6 days respectively. Find the Critical path.
  5. What is a contract? What are the types of contract? Explain Item rate contract.
  6. List the steps involved in RA bill submission, scrutiny and payment.
  7. Briefly explain the following,
    1. ledger accounts.
    2. Imprest Account.
    3. Cashbook.
    4. Suspense classification.
  8. Write the precautions and Preventive measures for accident in construction industry.
  9. Explain the various stages of inspection and quality control for RCC work and Excavation in Foundation.
  10. A building costing Rs. 15lakhs has been constructed on a open land measuring 100sqm. The prevailing rate of land in the neighbourhood is Rs. 4500 per sqm. Determine the net rent of the property if the expenditure on outgoing expenses including sinking fund is Rs. 42000 per annum. Also work out the gross rent of the property per month.

For detail syllabus of all other subjects of BE Civil, C15 scheme do visit Civil 6th Sem syllabus for C15 scheme.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.