Estimating and Costing detail DTE Kar Diploma syllabus for Civil Engineering (D’Ship) (CD), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15CE53T), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.
For all other draftsman 5th sem syllabus for diploma c15 scheme dte karnataka you can visit Draftsman 5th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for estimating and costing is as follows.
Pre-requisites:
Knowledge of basic Mathematics, Materials of Construction, Construction Technology, Building Planning and Drawing.
Course Objectives:
- To differentiate the types of Estimation, adopt specification and Unit Rates.
- To analyse rates for different items of works.
- To interpret the drawings and estimate the Quantities of various items in civil engineering structures.
- To understand departmental procedures and Take measurement of completed work
Course Outcomes:
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
1. INTRODUCTION TO ESTIMATION
- Introduction to estimating: different items of works and types of estimates.
- Units of measurements and units of payment of different items of work.
- Deduction of Openings in different items of works and Measurements as per BIS-2000.
- Bill of Quantities (BOQ), Scheduled rates, Lead Statements. 04
2. SPECIFICATIONS
Earthwork in excavation for foundation, Cement concrete in foundation, Brick masonry, R.C.C Work, Plastering in Cement mortar, Pointing with cement mortar, Cement concrete flooring, Granite / Vitrified / Marble flooring, Centering and shuttering works, Distempering, Exterior painting (Cement), Woodwork for windows and doors, Painting woodwork and steel, Glazing works for building. Application of specifications in BOQ. 05
3. ANALYSIS OF RATES
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
4. DETAILED AND ABSTRACT ESTIMATE OF BUILDINGS USING 13
LONG WALL SHORT WALL METHOD Prepare the detailed and abstract estimate of,
- One room building- Ground floor with flat RCC roof
- Two room building- Ground floor with flat RCC roof
- 1BHK Residential building – Ground floor with flat RCC roofand Pitched roof withload bearing wall.
- 2BHK Residential building – Ground floor with flat RCC rooffor framed structures.
- Building with semi circular/ Hexagonal room walls – Ground floor with flat RCC roof.
- School building – Ground floor with flat RCC roof.
5. DETAILED AND ABSTRACT ESTIMATE OF BUILDINGS USING CENTRE LINE METHOD
Prepare the detailed and abstract estimate of,
- One room building- Ground floor with flat RCC roof
- Two room building- Ground floor with flat RCC roof
- 1BHK Residential building – Ground floor with flat RCC roofand Pitched roof with load bearing wall.
- 2BHK Residential building – Ground floor with flat RCC rooffor framed structures.
- Building with semi circular/ Hexagonal room walls – Ground floor with flat RCC roof.
School building – Ground floor with flat RCC roof.
6. ESTIMATION OF ROAD WORKS
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
Course Delivery:
The course will be delivered through lectures and Power point presentations/ Videos, demonstrations etc.
STUDENT SUGGESTED ACTIVITIES
The topic should be related to the course in order to enhance his knowledge, practical skill & and lifelong learning, communication, modern tool usage.
- Prepare Check list for different items of following type of Civil Engineering works.
- Load Bearing Building Structure.
- Framed structure type of building
- W.B.M.Road
- Septic Tank
- Community well
- Writing the rules of deduction of openings for below mentioned items of work as per IS 1200.
- Brick / Stone masonry
- Plastering / Pointing
- Preparing detailed estimate of a RCC single & two storied existing residential building for all items of work.
- Prepare the lead statement for earth work excavation for a Road.
- Prepare the lead and lift statement for a building.
- Student should visit the site and study the no of labours required for a particular item of work and compare it with the SR by doing Rate analysis as per site observation.
- Collect the market data for cost of construction materials and implement in rate analysis and compare it with the SR book.
- Rate analysis to be done for construction activities by using alternate materials like M-sand for River sand and analyse the difference of rates.
- Rate analysis for works under Lump sum (LS) head to be studied in detail and compared with present SR.
- Detailed estimate of any building before project to be compared during execution and after completion of project.
- Reconciliation of materials for a particular item need to done foranongoing project.
- Detailed estimate for any two or more residential buildings to be compared and rate per unit area to be find out which will help in present market survey.
- Visit any construction site and study weekly/monthly RA bill submission from Contractors.
- Collecting old setof tender document and writing a report on it.
- Collection of tender notices published in newspapers for various items of civil engineering works (at least 5) write salient features of them.
- Drafting a tender notice for construction of a civil engineering work ( W. B. M. Road, residential building )
- Preparation of tender document for the building (detailed estimate prepared for RCC. building in estimating and costing shall be used) of various account forms from PWD & writing report on it.
- Writing a report on store procedure and account producer of PWD for it (Guest lecture of PWD official may be arranged)
- Writing detailed specifications for one item from each of following :
- Irrigation engineering system
- Transportation engineering system.
- Environment engineering system.
- Building construction system
NOTE:
- Students should select any one of the above or other topics relevant to the subject approved by the concerned faculty, individually or in a group of 3 to
- Students should mandatorily submit a written report and make a presentation on the topic. The task should not be repeated among students. Report will be evaluated by the faculty. Weightage for 5 marks Internal Assessment shall be as follows: Unsatisfactory 1, Developing 2, Satisfactory 3, Good 4, Exemplary 5
- Reports should be made available along with bluebooks to IA verification officer.
Model Question Paper:
FOR -CIE (TESTS)
- What is an Estimate? What are its types? Explain anyone briefly.
- BOQ
- Lead statement
- List the conditions of Deductions of openings during plastering.
- Write down detailed specification of the following,
- Plastering in Cement mortar 1:6
- Cement concrete in Foundation 1:2:4
- Define Analysis of Rates. Explain the various steps taken into consideration for preparing detailed Analysis of rates. OR Analyse the rates of 1cumof RCC(1:2:4) slab reinforced with MS reinforcement upto 90kg/cum of CC including Centering and Shuttering laid in position, complete in all respects. Assume suitable market rates.
OR Write a short note on,
Reference Books:
- Dutta B N, “Estimation and costing in civil engineering theory and practice”, 27th edition, UBS Publisher’s Distributors (P) Ltd New Delhi.
- D.D.Kohli & Ar.R.C.Kohli, “Estimating and Costing(CIVIL)”2013 edition, S.CHAND Publications.
- IS: 1200 Part 1 to 28, Method of Measurement of Building and Civil Engineering Works.
- Chakroborti M, “Estimating, costing and specifications in Civil Enginnering”-2006.
- Rangawala S C,”Valuation of Real properties” Charotar Publishing House -2008.
E-Learning
- http://www.nprcet.org/civil/document/CE702-ESTIMATION.pdf
- http://theconstructor.org/construction/reinforcement-quantity-estimation/6802/
- https://www.youtube.com/watch?v=buUKMbXfEUI
- http://218.248.45.169/download/training/ppt3.pdf
- http://www.slideshare.net/thomasjbritto/estimating-andcosting-book
- http://bieap.gov.in/Pdf/CTPaperIIYR2.pdf
- https://www.wbdg.org/ccb/DOD/UFC/ufc_3_740_05.pdf
- http://bie.telangana.gov.in/Pdf/estimatingandcosting.pdf
- http://cpwd.gov.in/Publication/Specs2009V1.pdf
Model Question Paper:
PART-A
- Answer any one from the following (10×1=10)
- What is an Estimate? What are its types? Explain any one briefly.
- Write a short note on,
- BOQ,
- Lead statement.
- Write the detailed specification(any one) (10×1=10)
- Concreting for RCC Slab 1:1.5:3 & Earthwork in foundation.
- Plastering in Cement mortar & Granite/Vitrified/Marble flooring.
- Prepare Rate analysis for any one of the following(10×1=10)
- Concreting for RCC Slab 1:1.5:3
- Earthwork in foundation.
PART -B
- Prepare detailed and abstract estimate for the following items of the building as shown in fig (by any method)
- Earthwork excavation in foundation.
- Brick work in cement mortar in foundation and plinth.
- Internal Plastering excluding Bath and W/C.
- RCC for Lintels and Chajjas above opening.(with 1.5% steel)
- External plastering.
RESIDENTIAL BUILDING
Follow the figure from the pdf.
PART-C
- Estimate the quantity of earthwork for the portion of a road between chainages 0 to 10 from the following data, lengths being measured with a standard 20m chain.
- Chains: 0 1 2 3 4 5 6 7 8 9
- G.L: 131.1 131.2 130.9 130.8 130.7 130.6 130.4 129.1 129.5 129
- Earthwork excavation for the pavement shown in figure
- 6″ Base concrete for the road.
- Top concrete surface.
- 2″ Asphalt layer above top layer.
- Asphalt kerbing on both sides.
The formation level at 0 chainage is 130.0 and the road is in a rising gradient of 1 in 200.
The width of formation 9m. and the side slopes 1.5: 1 in banking and 1:1 in cutting. The lateral slope of the ground may be assumed as level. -20m
OR
Estimate the quantities of the following items of works for the cross section of a1km long road shown in fig.
For detail syllabus of all other subjects of BE Draftsman, C15 scheme do visit Draftsman 5th Sem syllabus for C15 scheme.
Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.