3rd Sem, Civil Draftsmanship Diploma

15CD31P: Surveying Practice-II Draftsman 3rd Sem Syllabus for Diploma DTE Karnataka C15 Scheme

Surveying Practice-II detail DTE Kar Diploma syllabus for Civil Engineering (D’Ship) (CD), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15CD31P), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other draftsman 3rd sem syllabus for diploma c15 scheme dte karnataka you can visit Draftsman 3rd Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for surveying practice-ii is as follows.

Pre-requisites:

Knowledge of Surveying Practice -1 & Surveying-II

Course Objectives:

  1. To provide knowledge of Total Station & advanced surveying instruments.
  2. Develop skills in using Total Station & advanced surveying instruments and analyse data.
  3. Develop skills to set out Curves in the field using both Total Station and Theodolite.
  4. Develop skills to conduct traverse survey & to find the area

Course Outcomes:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

1. Theodolite

  1. Experiment 1: Study of parts of a Transit Theodolite and its temporary adjustments 3
  2. Experiment 2: Measurement of horizontal angle by Repetition method 3
  3. Experiment 3: Measurement of horizontal angle by Reiteration method 3
  4. Experiment 4: Measurement of vertical angle 3
  5. Experiment 5: Open traversing using theodolite and plotting 3
  6. Experiment 6: Conducting a Closed traverse of a given area and balancing it by
    1. Bowditch rule &
    2. Transit rule 6

2. Trigonometric Levelling

  1. Experiment 7: Determination of height of an object whose base is accessible 3
  2. Experiment 8: Determination of height of an object whose base is inaccessible (single plane method instrument axes at different levels only-two cases. 3

3. Tachometric Surveying

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

4. Curves

  1. Experiment 12: Setting out simple curve by Offsets from Long chord method 3
  2. Experiment 13: Setting out simple curve by Rankines method using Theodolite and Total station 3
  3. Experiment 14: Setting out Compound curves given two Radii by Deflection angle method 3

5. Total Station

  1. Experiment 15: Total station-general commands used- instrument preparation and setting-reading distances and angles 6
  2. Experiment 16: Measurement of distances and coordinates of given points, using
    1. EDM
    2. Total station 6
  3. Experiment 17: Measurement of altitudes of given elevated points, using total station 3
  4. Experiment 18: Run a closed traverse using Total station and plotting the traverse 6
  5. Experiment 19: Determination of areas of field (enclosed three or more points) bytotal station 6

6. Global Positioning System

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

Course Delivery:

The course will be delivered through lectures, demonstration, site visits, expert lectures.

SUGGESTED STUDENT ACTIVITY

The topic should be related to the course in order to enhance his knowledge, practical skill & and lifelong learning, communication, modern tool usage.

  1. Road survey (at least for 100m) by total station.
  2. Conduct a traverse survey of a given plot and find out the area.
  3. Prepare the contour maps of the given area in your locality.
  4. Set out a center line of a given building using theodolite.
  5. Find out the parameters of a curve for an existing road in your locality.
  6. Locate a permanent structure using GPS in your locality and prepare a map.
  7. Prepare a topographical map by using total station.
  8. Detailed study report on telescope used in surveying instrument.
  9. To set out two parallel lines along both the sides of an obstacle by using total station.
  10. To find the distance between two inaccessible points by using total station.
  11. Make a presentation on refraction error, curvature error caused by telescope.
  12. Prepare a report on any one of the following. Arial survey, photogrammetric survey, hydrographic survey, military survey and mine survey.

NOTE

  1. Students should select any one of the above or other topics relevant to the subject approved by the concerned faculty, individually or in a group of 3 to
  2. Students should mandatorily submit a written report and make a presentation on the topic. The task should not be repeated among students. Report will be evaluated by the faculty. Weightage for5 marks Internal Assessment shall be as follows: Unsatisfactory 1, Developing 2, Satisfactory 3, Good 4, Exemplary 5
  3. Reports should be made available along with bluebooks to IA verification officer

Text Books:

  1. Surveying and Levelling Vol- I & II by B C Punmia
  2. Fundamentals of Surveying by S K Roy
  3. Surveying and Levelling by T P Kanetkar & S V Kulkarni
  4. Surveying and Levelling by S S Bhavikatti vol 1 & 2
  5. Surveying by Duggal
  6. Surveying by R Agor
  7. Surveying and Levelling by N N Basak
  8. Advanced Surveying by R Agor

E-links

  1. http://nptel.ac.in/video.php?subjectId=105104101
  2. http://media.sakshat.ac.in/NPTEL-IIT-Videos/
  3. http://nptel.iitk.ac.in/courses/Civil_Eng/IIT%20Roorkee/Surveying.htm
  4. http://nptel.iitk.ac.in/
  5. http://www.slideshare.net/Ehabtariq/surveying-by-using-digital-theodolite
  6. http://www.tcd.ie/civileng/Staff/Brian.Caulfield/3A1/3A1%20Lecture%206.pdf
  7. http://madinpoly.com/pdf/labmanual/1/surveying%20practical-ii%28317%29.pdf

LIST OF EQUIPMENTS

  1. THEODOLITE WITH 20″ LC 10
  2. EDM 06
  3. TOTAL STATION 06
  4. HAND HELD GPS NAVIGATOR 05
  5. LEVELLING STAFF 10
  6. PRISM AND PRISM POLE AND ELECTRONIC BOOK 06
  7. LINKING SOFTWARE 02

VIVA QUESTIONS

Theodolite

  1. Difference between a Transit Theodolite and a Dumpy level.
  2. Difference between Swinging and Transiting.
  3. Difference between Telescope normal and Telescope inverted.
  4. Difference between Repetition method and Reiteration method.
  5. What is meant by size of Theodolite.
  6. What is the function of Levelling head and shifting head.
  7. Define the term Changing face.
  8. What are the uses of a Theodolite.
  9. What are the fundamental lines of a Theodolite and how they are Related.
  10. What are the errors in Theodolite work.

Theodolite traversing

  1. What is meant by Theodolite traversing.
  2. Difference between open traverse and closed traverse.
  3. Difference between independent co-ordinates and consecutive co-ordinates.
  4. Define the term Lattitude and Departure.
  5. What is meant by Closing error and Balancing the Traverse.
  6. Difference between Bowditch rule and Transit rule.
  7. What are the Principles of a Closed traverse.
  8. What is meant by Ommitted measurements.
  9. Difference between Included angle and Deflection angle.

Trigonometric levelling.

  1. What is meant by Trigonometrical levelling.
  2. Under what circumstances Trignometrical levelling is adopted.
  3. What is meant by single plane method.

Tacheometry

  1. Explain the principle of Tacheometry.
  2. Under what circumstances Tacheometric surveying is adopted.
  3. List the advantages and disadvantages of Tacheometer.
  4. What are Tacheometric constants and how to eliminate additive constant zero.
  5. What is Annalatic lense and where it is used and what is its purpose.
  6. How horizontal distances and elevations are determined by Stadia hair method.

Curves

  1. Define the following terms
    1. Point of commencement.
    2. Point of tangency
    3. Length of Curve
    4. Length of long chord.
    5. Degree of curve.
  2. What is the relation between degree of curve and radius of curve.
  3. Under what circumstances the following curves are adopted.
    1. Simple Circular curve
    2. Compound curve.
    3. Reverse Curve
    4. Transition curve
    5. Valley curve
    6. Summit curve.
  4. What are the precautions to be taken while introducing reverse curve.
  5. What are the functions and objectives of transition Curve?
  6. What are the importance of Curves?

Total Station.

  1. What is a Total station.
  2. What are the advantages of total station.
  3. What are the applications of total station.
  4. What is meant by Electronic Theodolite.
  5. What are the principlesof an electronic theodoloite.
  6. What is the Brain of Total Station.

GPS & GIS

  1. What is meant by Remote sensing and What are its basic Principles.
  2. What are the applications of Remote sensing.
  3. What are GPS receivers?
  4. What is meant by GIS and what are its applications.
  5. Compare GIS with Auto CAD.
  6. What are the uses of GPS Navigators.

For detail syllabus of all other subjects of BE Draftsman, C15 scheme do visit Draftsman 3rd Sem syllabus for C15 scheme.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.