5th Sem, Architecture Diploma

15AR52T: Estimating and Costing-II Archi 5th Sem Syllabus for Diploma DTE Karnataka C15 Scheme

Estimating and Costing-II detail DTE Kar Diploma syllabus for Architecture (AR), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15AR52T), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.

For all other archi 5th sem syllabus for diploma c15 scheme dte karnataka you can visit Archi 5th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for estimating and costing-ii is as follows.

Pre-requisites:

Estimating and costing – I, Building construction and drawing -1 & II

Course Objectives:

  1. To determine the probable cost estimate for a building including interiors.
  2. To compute quantity of wood for specified joineries.
  3. To analyze from first principle, the rates of various interior items of a building.

Course Outcomes:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

UNIT 1: Estimation and costing of pitched roof Buildings 13Hrs

Prepare the detailed estimate of quantities and abstract estimate of cost along with specifications of different items of works for the following types of buildings.

  1. Residential building with pitched roof (using RCC and AC /GI sheets with steel roof trusses)
  2. Mangalore tiled lean to roof Residential building having rafters and battens as roof supports

UNIT 2: Analysis of rates (Interior items) 10 Hrs

Analysis of rate for the following interior furniture and furnishings

  1. Wooden single seater Sofa using teak wood with cushions for seat and back rest
  2. Double cot with mattress using ply wood and decorative laminates
  3. Wardrobe using 19mm block board pre laminated both sides
  4. Aluminum Partitions using glass and pre laminated particle board
  5. False Ceiling using Gypsum Board with GI Sections
  6. Wall Paneling using teak wood frame work with ply wood and veneer
  7. Curio unit using ply wood and decorative laminates

UNIT 3: Estimation and costing of Interiors 13Hrs

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

UNIT 4 :Estimation of wood quantity 6Hrs

Estimating the quantity of wood for following types of doors and windows

  1. Doors – Fully paneled, single leaf and double leaf
  2. Windows – Fully glazed shutters with mullion

UNIT 5 Estimation of Repair and renovation works 10Hrs

Cost estimation of Repair and renovation works for the following items of a residential building

  1. Chipping and removing of existing interior and exterior wall plastering and plastering the same with 1:6 cement mortar
  2. Scraping and removing of interior and exterior wall paint and providing the same with specified type of paint
  3. Chipping and removing of existing flooring and providing the same with specified type of flooring
  4. Removing existing damaged Doors, windows and ventilators and replacing them by specified type of new one
  5. Dismantling of existing WPC and replacing the same with specified type WPC

Text Books:

For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.

Web links

  1. https://czymcdn.com/sites/www.aspenational.org/resource/resmgr/Techical Papers/2015 M ay TP.pdf
  2. http://www.productmanualguide.com/newpdf/construction-estimating-book-pdf.pdf

Suggested student activities:

  1. To conduct market survey and to collect information on interior building materials along with rates
  2. To conduct market survey of finished interior furniture and furnishings
  3. To prepare estimate foran existing pitched roof building and submit the same

Execution Note:

  1. Maximum of 4 students in each batch for student activity
  2. Any two activities (either from the list given or any similar activities) shall be assigned among different batches; may be assigned by the teacher based on interest of the students.
  3. Project activities shall be carried out throughout the semester and present the project report at the end of the semester; concerned teacher is expected to observe and record the progress of students activities
  4. Submit qualitative hand-written report not exceeding 6 pages; one report per batch
  5. Each of the activity can be carried out off-class well in advance; however, demonstration/presentation should be done during laboratory sessions
  6. Assessment shall be based on quality of work as prescribed by the following rubrics table

Model Question Paper:

PART A

  1. Prepare the detailed estimate of quantities and abstract estimate of cost along with specifications for the following items of works for Residential building whose plan and sectional details are given in fig no-1of the accompanying sketch. 3X10=30
    1. AC sheet roofing with steel truss
    2. BBM in superstructure in CM 1:6
    3. OR 12 mm thick interior wall plastering using 1:6 cement mortar

    4. Red oxide Flooring over a base concrete of 1:4:8
    5. OR
      Dadoing of walls for a height of 1.m in bath and w/c using glazed ceramic tiles

PART B

  1. Analyze from first principle the rate for any two of the following items 2X10 =20
    1. Wooden single seater Sofa using teak wood with cushions for seat and back rest
    2. Wardrobe using 19mm block board pre laminated both sides
    3. OR
      Aluminum Partition using glass and pre laminated particle board

  2. Prepare the cost estimate for interior furniture and furnishings for any two of the following residential units. 2×10=20
    1. Living: Single and three seater sofa with teapoy made of teak wood, Curio unit using ply wood and decorative laminates, door and window curtains with pelmet box
    2. Bed room: Double cot with mattress using ply wood and decorative laminates,
    3. Dining: Dressing unit with stool made of plywood and decorative laminate and Wardrobe using 19mm block board pre laminated both sides Teak wood Dining table with glass top, teak wood chairs with cushion seat and back rest, crockery cabinet made of pre laminated block board and glass and floor carpet
  3. Estimate the quantity of wood for a fully paneled door , single leaf with the following component details 1×10=10
    1. Size of the door – 1100mmx2100 mm
    2. Frame – 100mmx750mm
    3. Style – 100mmx40mm
    4. Top rail – 200mmx40mm
    5. Bottom rail – 250mmx40mm
    6. Lock rail – 150mmx40mm
    7. Panel – 25mm thick
    8. Rebate – 12mm
  4. Prepare Cost estimation of Repair and renovation works for the following items of a residential building whose plan and sectional details are given in fig no 2 of the accompanying sketch 2×10=20
    1. Chipping and removing of existing interior wall plastering and plastering the same with 1:6 cement mortar
    2. Removing existing damaged Steel Doors, windows and ventilators and replacing them by wooden doors, windows and ventilators
    3. OR
      Dismantling of existing WPC and replacing the same with Integral type WPC

For detail syllabus of all other subjects of BE Archi, C15 scheme do visit Archi 5th Sem syllabus for C15 scheme.

Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.