Estimating and Costing-I detail DTE Kar Diploma syllabus for Architecture (AR), C15 scheme is extracted from DTE Karnataka official website and presented for diploma students. The course code (15AR42T), and for exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.
For all other archi 4th sem syllabus for diploma c15 scheme dte karnataka you can visit Archi 4th Sem Syllabus for Diploma C15 Scheme DTE Karnataka Subjects. The detail syllabus for estimating and costing-i is as follows.
Pre-requisites:
Materials of construction and Architectural Drawing
Course Objectives:
- The course is aimed at learning various methods of preparing cost estimate for a proposed building project.
- To analyze from first principle, the rates of various items of a building.
- To prepare cost estimate of a proposed building given the detailed specification of the materials and the drawings.
Course Outcomes:
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
UNIT 1: INTRODUCTION TO ESTIMATION
Introduction to Estimation, necessity, steps involved in estimation. Detail estimate of quantities Different items of works. Unit of measurement for various items of work. Types of estimate. Different methods of taking out quantities – centre line method and long short wall method.
UNIT 2: SPECIFICATION
Necessity of preparing detailed specification.
Detailed specifications for
- Earthwork excavation in foundation
- Cement concrete in foundation
- Ashlar masonry
- Brick work in super structure
- R.C.C roof slab
- Woodwork for windows and doors
- Cement concrete flooring
- Plastering in Cement mortar
- Distempering
- Painting woodwork
- Asbestos cement corrugated sheet roofing
- Mangalore Tiled Roofing
UNIT 3: ANALYSIS OF RATE
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
UNIT 4: DETAILED ESTIMATE
Prepare the detailed estimate of quantities and abstract estimate ofcost for a given building with specification for each item of work.
- A single roomed R.C.C building
- Two roomed R.C.C building.
- Residential building -single storied with flat RCC roof.
Text Books:
- Estimating and Costing in Civil Engineering – B.N. Datta
- Estimating and Costing in Civil Engineering – M. Chakraborti
- Estimating and Costing in Civil Engineering – S.C. Rangwala
- Estimating and Costing in Civil Engineering – Mahajan
- Estimating and Costing in Civil Engineering – P.L. Bhasin
- Estimating and Costing in Civil Engineering – V.N. Vazirani and S.P. Chandola
Web links
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. Its a light weight, easy to use, no images, no pdfs platform to make students life easier.
Suggested student activities:
- To conduct market survey and to collect information on building materials along with rates
- To collect information on fittingsand fixtures (water supply, sanitary and hardware)
- To prepare Estimate foran existing building and submit the same
Execution Note:
- Maximum of 2 students in each batch for student activity
- Any two activities (either from the list given or any similar activities) shall be assigned among different batches; may be assigned by the teacher based on interest of the students.
- Project activities shall be carried out throughout the semester and present the project report at the end of the semester; concerned teacher is expected to observe and record the progress of students’ activities
- Submit qualitative hand-written report not exceeding 6 pages; one report per batch
- Each of the activity can be carried out off-class well in advance; however, demonstration/presentation should be done during laboratory sessions
- Assessment shall be based on quality of work as prescribed by the following rubrics table
Model Question Paper:
PART A 4X5=20
- What is the necessity of preparing estimate?
- Write the units of the following items
- Size stone masonry
- Mangalore tiled roofing
- Granite flooring
- Wood work in frames
- Pointing
- List different types of estimates.
- Explain long wall and short wall method of taking out measurements.
- Write detail specification of plastering with cement mortar.
- write detail specification for Earth work excavation in foundation
PART B 2X10 =20
- Analyze from first principle the rate for any two of the following items ofwork
- Painting wood work using enamel paint
- Brick masonry in super structure using 1:6 cement mortars
- Exterior wall painting using water proof cement paint
PART C 4×15=60
- Prepare detailed estimate of quantities and abstract of estimated cost for any four of the following items ofwork pertaining to a residential building whose plan and sectional details are given in the accompanying sketch
- RCC work in roof slab using CC 1: ‘5. :3( M20 )
- Wood work in doors and windows for shutters
- Size stone masonry in cement mortar 1:6 for foundation
- Granite flooring using granite slabs laid on a mortar topping of 1:6 of thickness 20mm
- Internal wall painting using plastic emulsion paint two coats over a coat of primer
- Weather proof course
For detail syllabus of all other subjects of BE Archi, C15 scheme do visit Archi 4th Sem syllabus for C15 scheme.
Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.