Surveying I detail BTEUP Diploma syllabus for Civil Engineering, effective from 2017 is collected from BTEUP 2017 Syllabus official website and presented for diploma students. The course details such as exam duration, Teaching Hr/week, Practical Hr/week, Total Marks, internal marks, theory marks, duration and credits do visit complete sem subjects post given below. The syllabus PDFs can be downloaded from official website.
For all other civil 4th sem bteup diploma syllabus 2017 you can visit Civil 4th Sem BTEUP Diploma Syllabus 2017 Subjects. The detail syllabus for surveying i is as follows.
Rationale:
The important functions of a Civil engineering technician includes the jobs of:
- Detailed Surveying,
- Plotting of Survey data,
- Preparation of Survey maps and setting out works.
While framing the curriculum for the subject of “surveying” stress has been given to the development of the skill in each type of sruvey like chain surveying, compass surveying and levelling – that the Civil Engineering Diploma holder will normally be called upon to perform.
Field work should be so selected that, as far as possible, the student can check his work and have an idea of the results, that is the extent of error in the work done by him. As far as possible, the surveys done should be got plotted, as this will also reveal errors in the work and develop skill in plotting.
DETAILED CONTENTS
1. Introduction
Concept of surveying, purpose of surveying, Measurements linear and angular, units of measurement, instruments used for taking these measurements. Classifcation of survey based on insturments. Basic principles of surveying.
2. Chain Surveying
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.
3. Compass Surveying
Purpose of compass prismatic compass. setting and taking surveying. Construction and working Use of prismatic Compass, Method observations. Concept of following:
- Maridian – Magnetic, true and arbitrary.
- Bearing- Magnetic, true and arbitrary.
- Whole circle bearing and reduced Bearing,
- Fore and back bearing.
- Magnetic dip and declination
Local attraction-cuases, detection, errors and correction. Problems on local attraction,magnetic declination and calculation of included angles in a compass traverse. Concept of a traverse-Open and closed traverse. Traversing with a prismatic compass. Checks for an open and closed traverse. Plotting of a traverse – By included and deflection angles. Concept of closing error. Adjustment of traverse graphically by proportionate method. Errors in compass surveying. Testing and adjustment of a prismatic compass. Use of surveyers compass and its construction details, comparison with prismatic compass.
4. Levelling
Pupose of levelling, concept of a level surface, horizontal surface, vertical surface, datum,rduced level and bench marks. Principle and construction of dumpy, I.O.P. (tilting)levels. Concepts of line of collimation, axis of the buble tube, axis of the telescope and vertical axis. Levelling staff
- single piece
- folding
- sopwith
- invar precision staff.
Temporary adjustment:setting up and levelling, adjusting for parallax of Dumpy and I.O.P. level. Differential levelling, concept of back sight, fore sight, intermediate sight, station, change point, height of instrument. Level book and reduction of levels by Height of collimation method and Rise and fall method. Arithmetical checks. Problem on reduction of levels. Fly levelling, check levelling and profile levelling (L-section and X-section) Errors in levelling, and precauations to minimise them and permissible limits. Reciprocal levelling. Difficulties in levelling. Concept of curvature and refraction. Testing and adjustment of dumpy and IOP level. Numerical problems.
5. Minor Instruments :
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.
FIELD WORK
Chain Surveying
- Ex i:
- Ranging a line.
- Chaining a line and recording in the field book.
- Testing and adjustment of chain.
- Ex ii:
- Chaining of a line involving reciprocal ranging.
- Taking offsets and setting out right angles with cross staff and Indian optical square.
- Ex iii: Chain survey of a small area.
- Ex iv: Chaining a line involving obstacles in ranging.
Plate I
Compass Survey
For complete syllabus and results, class timetable and more pls download iStudy Syllabus App. It’s a lightweight, easy to use, no images, no pdfs platform to make students life easier.
Levelling with auto level:
- Ex x: To find the difference of level between two distant points by taking staff readings on different stations from the single setting.
- Ex xi: To find the difference of level between two points by taking atlest four change points.
- Ex xii: Longitudinal sectioning of a road.
- Ex xiii: Cross-sectioning of a road.
- Ex xiv: Setting a gradeint by IOP and auto level.
Plate V
Plate VI
Minor Instrument :
- Ex xv: Setting and checking grades with Abney’s grades with level. Setting and checking Ceylone Ghat Tracer.
- Ex xvi: Finding heights by Indian Pattern Clinometer (Tangent Clinometer)
- Ex xvii: Use of planimeter for computing areas.
- Ex xviii: Enlargment/ reduction of a plan pentagraph. by the use of pentagraph.
Contouring
- Ex xix: Preparing a contour plan by radial line method by the use of a Tangent clinometer/Tacheometer.
- Ex xx: Preparing a contour plan by method of squares.
Plate-1.
Plate-1.
For detail syllabus of all other subjects of BE Civil, effective from 2017 do visit Civil 4th Sem BTEUP syllabus for 2017.
Dont forget to download iStudy Syllabus App for latest syllabus and results, class timetable and more.