{"id":6794,"date":"2020-08-05T00:26:05","date_gmt":"2020-08-05T00:26:05","guid":{"rendered":"https:\/\/www.inspirenignite.com\/mh\/government-polytechnic-kolhapur-diploma-cutoff-2019\/"},"modified":"2020-08-05T00:26:05","modified_gmt":"2020-08-05T00:26:05","slug":"government-polytechnic-kolhapur-diploma-cutoff-2019","status":"publish","type":"post","link":"https:\/\/www.inspirenignite.com\/mh\/government-polytechnic-kolhapur-diploma-cutoff-2019\/","title":{"rendered":"Government Polytechnic Kolhapur Diploma Cutoff 2019"},"content":{"rendered":"<p>Government Polytechnic Kolhapur Diploma Cutoff 2019 will give you all updated information on Post SCC Diploma in Engineering and Technology closing rank and closing merit percentile in each CAP round. Minority cutoff ranks are also given for govt minority and private minorty institutes.To easily access cutoff informtion about Diplloma cutoffs we made a college predictor tool. Do refer to the tool below.<\/p>\n<h2 class=\"ini_cat_button\"><a href=\"https:\/\/www.inspirenignite.com\/mh-polytechnic-diploma-cutoffs-and-college-predictor\/\">MH Polytechnic Diploma Cutoffs and College Predictor<\/a><\/h2>\n<p>Few Govt. Polytechnics have specific number of seats allocated to different minority students belonging to Buddh, Christian, Jain, Muslim, Sikh  Parsi  for both General and Ladies. Minority Seats are allocated to minority students. Minority Colleges include Linguistic minorities such as Hindi speaking, Gujarati, Sindhi, whereas religious minority includes Christians and Muslim minority institutes.<\/p>\n<p>         The seats in these minority institutes are filled with that specific minority. Seats codes  &#8220;N H&#8221; represents Home District Non-Technical Seats, &#8220;T H&#8221; represents Home District Technical Seats, &#8220;N O&#8221; represents Other Than Home District Non-Technical Seats &#8220;T O&#8221; represents Other Than Home District Technical Seats, &#8220;N S&#8221; State Level Non-Technical Seats and &#8220;T S&#8221; represents State Level Technical Seats, and &#8220;M&#8221; represents Minority Seats. Government Polytechnic Kolhapur is a government, autonomous institute established in 1961 having non-minority status. It is in Pune region and comes under urban area of Kolhapur district.                          For cutoffs do check following information.<\/p>\n<hr>\n<p><a href=\"#fee\">    Fee Structure  |<\/a> <a href=\"#round1\">    Cutoff Round 1  |<\/a> <a href=\"#round2\">    Cutoff Round 2  |<\/a><a href=\"#round3\">    Cutoff Round 3  |<\/a><\/p>\n<hr>\n<div id=\"round1\">\n<hr>\n<p><a href=\"#fee\">    Fee Structure  |<\/a> <a href=\"#round1\">    Cutoff Round 1  |<\/a> <a href=\"#round2\">    Cutoff Round 2  |<\/a><a href=\"#round3\">    Cutoff Round 3  |<\/a><\/p>\n<hr>\n<h3>Government Polytechnic Kolhapur CAP Round 1 Diploma Cutoff 2019 (Ranks and Merit Percentile)<\/h3>\n<table class=\"borderTable\">\n<tr>\n<th>Department<\/th>\n<th>Special Category<\/th>\n<th>Seat Type<\/th>\n<th>GOPEN                    <\/th>\n<th>GSC<\/th>\n<th>GST<\/th>\n<th>GVJ<\/th>\n<th>GNT1<\/th>\n<th>GNT2                    <\/th>\n<th>GNT3<\/th>\n<th>GOBC<\/th>\n<th>GSEBC<\/th>\n<th>LOPEN<\/th>\n<th>LSC<\/th>\n<th>LST                    <\/th>\n<th>LVJ<\/th>\n<th>LNT1<\/th>\n<th>LNT2<\/th>\n<th>LNT3<\/th>\n<th>LOBC<\/th>\n<th>LSEBC<\/th>\n<th>PHC<\/th>\n<th>TWS                    <\/th>\n<th>DEF<\/th>\n<th>EWS<\/th>\n<th>MI<\/th>\n<th>ORPHAN<\/th>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>3905 (87.60)<\/td>\n<td>17022 (79.20)<\/td>\n<td>54197 (56.60)<\/td>\n<td>17094 (79.00)<\/td>\n<td>9414 (83.40)<\/td>\n<td>13452 (81.00)<\/td>\n<td><\/td>\n<td>20867 (77.00)<\/td>\n<td>21379 (76.80)<\/td>\n<td>2202 (89.60)<\/td>\n<td>9776 (83.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>36614 (68.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>23575 (75.60)<\/td>\n<td>14956 (80.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>21061 (77.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>23900 (75.40)<\/td>\n<td>53157 (57.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11455 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>58516 (52.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>5615 (86.00)<\/td>\n<td>16585 (79.40)<\/td>\n<td><\/td>\n<td>8200 (84.20)<\/td>\n<td>13101 (81.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>10744 (82.60)<\/td>\n<td>12382 (81.60)<\/td>\n<td>4313 (87.20)<\/td>\n<td>41768 (65.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11793 (82.00)<\/td>\n<td>16852 (79.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>55898 (55.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>14353 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>DEF<\/td>\n<td>NO<\/td>\n<td>21328 (76.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>2850 (88.80)<\/td>\n<td><\/td>\n<td>17237 (79.00)<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>7494 (84.60)<\/td>\n<td>29696 (72.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>35005 (69.40)<\/td>\n<td>39547 (66.80)<\/td>\n<td>7694 (84.60)<\/td>\n<td>31728 (71.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>18557 (78.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>65159 (40.00)<\/td>\n<td>26152 (74.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>35697 (69.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>7263 (84.80)<\/td>\n<td>21961 (76.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>8391 (84.00)<\/td>\n<td><\/td>\n<td>11511 (82.20)<\/td>\n<td>19674 (77.60)<\/td>\n<td>10492 (82.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>20719 (77.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>44436 (63.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>24444 (75.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>803 (92.20)<\/td>\n<td>19028 (78.00)<\/td>\n<td><\/td>\n<td>4580 (87.00)<\/td>\n<td>11442 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>7994 (84.40)<\/td>\n<td>2880 (88.80)<\/td>\n<td>527 (93.00)<\/td>\n<td>8184 (84.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>12476 (81.60)<\/td>\n<td><\/td>\n<td>4395 (87.20)<\/td>\n<td>2057 (89.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>1030 (91.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>15208 (80.00)<\/td>\n<td>12270 (81.80)<\/td>\n<td>1659 (90.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>3549 (88.00)<\/td>\n<td>19309 (77.80)<\/td>\n<td><\/td>\n<td>9881 (83.20)<\/td>\n<td><\/td>\n<td>14425 (80.60)<\/td>\n<td><\/td>\n<td>5825 (86.00)<\/td>\n<td>4303 (87.20)<\/td>\n<td><\/td>\n<td>22108 (76.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>14030 (80.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>DEF<\/td>\n<td>NN<\/td>\n<td>1684 (90.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>6093 (85.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>689 (92.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>4799 (86.80)<\/td>\n<td>19811 (77.60)<\/td>\n<td><\/td>\n<td>28173 (73.20)<\/td>\n<td>16885 (79.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>14266 (80.60)<\/td>\n<td>10374 (82.80)<\/td>\n<td>4733 (86.80)<\/td>\n<td>20550 (77.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>4783 (86.80)<\/td>\n<td><\/td>\n<td>18812 (78.20)<\/td>\n<td>28874 (72.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>17716 (78.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>11104 (82.40)<\/td>\n<td>23108 (75.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>31558 (71.40)<\/td>\n<td><\/td>\n<td>14524 (80.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>57490 (53.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>4656 (87.00)<\/td>\n<td>14251 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>11577 (82.20)<\/td>\n<td>15053 (80.20)<\/td>\n<td><\/td>\n<td>8178 (84.20)<\/td>\n<td>6786 (85.20)<\/td>\n<td>3743 (87.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11460 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>51776 (58.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>5932 (85.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>2309 (89.40)<\/td>\n<td><\/td>\n<td>4857 (86.80)<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>5594 (86.20)<\/td>\n<td>43083 (64.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>23831 (75.40)<\/td>\n<td><\/td>\n<td>1653 (90.40)<\/td>\n<td>30554 (71.80)<\/td>\n<td><\/td>\n<td>28123 (73.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>10418 (82.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>60719 (49.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td>15717 (79.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>28002 (73.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>52880 (57.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>11929 (82.00)<\/td>\n<td>46357 (62.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>26048 (74.20)<\/td>\n<td>18682 (78.20)<\/td>\n<td>11053 (82.40)<\/td>\n<td>51654 (58.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>38783 (67.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>10898 (82.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>1392 (90.80)<\/td>\n<td><\/td>\n<td>51237 (59.00)<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>8576 (84.00)<\/td>\n<td>62986 (46.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>49394 (60.40)<\/td>\n<td>17028 (79.20)<\/td>\n<td>7967 (84.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>9392 (83.40)<\/td>\n<td><\/td>\n<td>43827 (64.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>18920 (78.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>19659 (77.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>38140 (67.67)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>17214 (79.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>21361 (76.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>20705 (77.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>51769 (58.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>49724 (60.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>26171 (74.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>23935 (75.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>14343 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>6046 (85.80)<\/td>\n<td>35590 (69.20)<\/td>\n<td><\/td>\n<td>48211 (61.20)<\/td>\n<td>30515 (71.80)<\/td>\n<td>45503 (63.20)<\/td>\n<td><\/td>\n<td>18364 (78.40)<\/td>\n<td>20291 (77.40)<\/td>\n<td>7952 (84.40)<\/td>\n<td>42541 (65.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>27313 (73.60)<\/td>\n<td>16192 (79.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>15469 (80.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>45727 (63.00)<\/td>\n<td><\/td>\n<td>20838 (77.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>18303 (78.40)<\/td>\n<td>7588 (84.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>53360 (57.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td>21475 (76.60)<\/td>\n<td>38582 (67.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>5787 (86.00)<\/td>\n<td>31570 (71.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>23244 (75.80)<\/td>\n<td><\/td>\n<td>31155 (71.60)<\/td>\n<td>10533 (82.80)<\/td>\n<td>17265 (79.00)<\/td>\n<td>38622 (67.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>32438 (70.80)<\/td>\n<td>15204 (80.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>34967 (69.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>44590 (63.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>1272 (91.20)<\/td>\n<td><\/td>\n<td>13924 (80.80)<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>7323 (84.80)<\/td>\n<td>45890 (62.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td>43250 (64.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>30345 (72.00)<\/td>\n<td>40407 (66.40)<\/td>\n<td>13586 (81.00)<\/td>\n<td>63287 (45.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>25297 (74.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>21384 (76.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>26495 (74.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11324 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>17047 (79.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>25274 (74.60)<\/td>\n<td><\/td>\n<td>8319 (84.20)<\/td>\n<td>17422 (78.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>10526 (82.80)<\/td>\n<td>40167 (66.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>33587 (70.20)<\/td>\n<td>16809 (79.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>38470 (67.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>44211 (64.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>36191 (68.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>32122 (71.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Metallurgical Engineering<\/td>\n<td>REG<\/td>\n<td>NS<\/td>\n<td>18996 (78.00)<\/td>\n<td>46077 (62.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td>35650 (69.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td>57442 (53.60)<\/td>\n<td>31797 (71.20)<\/td>\n<td>29614 (72.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td>55226 (55.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>42353 (65.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>11160 (82.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Sugar Technology<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>38172 (67.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>45129 (63.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Sugar Technology<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>26348 (74.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>28359 (73.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<hr>\n<p><a href=\"#fee\">    Fee Structure  |<\/a> <a href=\"#round1\">    Cutoff Round 1  |<\/a> <a href=\"#round2\">    Cutoff Round 2  |<\/a><a href=\"#round3\">    Cutoff Round 3  |<\/a><\/p>\n<hr>\n<div id=\"round2\">\n<h3>Government Polytechnic Kolhapur CAP Round 2 Diploma Cutoff 2019 (Ranks and Merit Percentile)<\/h3>\n<table class=\"borderTable\">\n<tr>\n<th>Department<\/th>\n<th>Special Category<\/th>\n<th>Seat Type<\/th>\n<th>GOPEN                    <\/th>\n<th>GSC<\/th>\n<th>GST<\/th>\n<th>GVJ<\/th>\n<th>GNT1<\/th>\n<th>GNT2                    <\/th>\n<th>GNT3<\/th>\n<th>GOBC<\/th>\n<th>GSEBC<\/th>\n<th>LOPEN<\/th>\n<th>LSC<\/th>\n<th>LST                    <\/th>\n<th>LVJ<\/th>\n<th>LNT1<\/th>\n<th>LNT2<\/th>\n<th>LNT3<\/th>\n<th>LOBC<\/th>\n<th>LSEBC<\/th>\n<th>PHC<\/th>\n<th>TWS                    <\/th>\n<th>DEF<\/th>\n<th>EWS<\/th>\n<th>MI<\/th>\n<th>ORPHAN<\/th>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>3052 (88.60)<\/td>\n<td>34049 (70.00)<\/td>\n<td>5467 (86.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>21769 (76.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>40546 (66.20)<\/td>\n<td>2450 (89.20)<\/td>\n<td><\/td>\n<td>7967 (84.40)<\/td>\n<td><\/td>\n<td>34640 (69.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>12360 (81.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>4652 (87.00)<\/td>\n<td>8174 (84.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>52354 (58.20)<\/td>\n<td>8964 (83.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>11464 (82.20)<\/td>\n<td><\/td>\n<td>14915 (80.20)<\/td>\n<td><\/td>\n<td>21527 (76.60)<\/td>\n<td><\/td>\n<td>22850 (76.00)<\/td>\n<td>26768 (73.80)<\/td>\n<td>28933 (72.67)<\/td>\n<td>11763 (82.00)<\/td>\n<td>11386 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>19818 (77.60)<\/td>\n<td>22048 (76.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>12577 (81.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td>43187 (64.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>5458 (86.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>8753 (83.80)<\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td>10979 (82.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>12442 (81.60)<\/td>\n<td><\/td>\n<td>9154 (83.60)<\/td>\n<td><\/td>\n<td>9209 (83.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>10852 (82.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>29121 (72.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>27764 (73.40)<\/td>\n<td>27940 (73.20)<\/td>\n<td>29028 (72.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>31062 (71.60)<\/td>\n<td><\/td>\n<td>30522 (71.80)<\/td>\n<td>30881 (71.60)<\/td>\n<td>23935 (75.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>10538 (82.80)<\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>DEF<\/td>\n<td>NS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>33575 (70.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>1045 (91.60)<\/td>\n<td><\/td>\n<td>1533 (90.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>1744 (90.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>999 (91.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>1992 (89.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td>21132 (76.80)<\/td>\n<td>6218 (85.60)<\/td>\n<td>5299 (86.40)<\/td>\n<td><\/td>\n<td>21361 (76.80)<\/td>\n<td><\/td>\n<td>1249 (91.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>43247 (64.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>ON<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>2248 (89.60)<\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>2805 (88.80)<\/td>\n<td><\/td>\n<td>8291 (84.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>14266 (80.60)<\/td>\n<td><\/td>\n<td>6305 (85.60)<\/td>\n<td>30455 (71.80)<\/td>\n<td>6554 (85.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td>20346 (77.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>5438 (86.20)<\/td>\n<td><\/td>\n<td>6559 (85.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>14474 (80.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>24582 (75.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>25944 (74.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>6786 (85.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>4079 (87.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>9284 (83.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>16755 (79.20)<\/td>\n<td>12316 (81.60)<\/td>\n<td>11460 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>18980 (78.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>6046 (85.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>8733 (83.80)<\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>DEF<\/td>\n<td>NS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>16423 (79.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td>6988 (85.00)<\/td>\n<td>13591 (81.00)<\/td>\n<td>9883 (83.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td>14471 (80.40)<\/td>\n<td>18153 (78.40)<\/td>\n<td>15059 (80.20)<\/td>\n<td>4120 (87.40)<\/td>\n<td>7076 (85.00)<\/td>\n<td>9704 (83.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>13059 (81.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>24066 (75.40)<\/td>\n<td>15478 (80.00)<\/td>\n<td>40896 (66.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>28944 (72.60)<\/td>\n<td>30680 (71.80)<\/td>\n<td>48358 (61.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>ES<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>51237 (59.00)<\/td>\n<td><\/td>\n<td>14526 (80.40)<\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>23859 (75.40)<\/td>\n<td>51312 (59.00)<\/td>\n<td>28016 (73.20)<\/td>\n<td>28357 (73.00)<\/td>\n<td>28391 (73.00)<\/td>\n<td><\/td>\n<td>28734 (72.80)<\/td>\n<td>31370 (71.40)<\/td>\n<td>38579 (67.40)<\/td>\n<td>16994 (79.20)<\/td>\n<td>16421 (79.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>17028 (79.20)<\/td>\n<td>41388 (65.80)<\/td>\n<td><\/td>\n<td>43136 (64.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>38744 (67.40)<\/td>\n<td>43844 (64.20)<\/td>\n<td>7216 (84.80)<\/td>\n<td><\/td>\n<td>47462 (61.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>46498 (62.40)<\/td>\n<td>48044 (61.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>ON<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>54638 (56.20)<\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>55220 (55.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>17253 (79.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>45886 (62.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>46944 (62.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>9899 (83.20)<\/td>\n<td>36102 (68.80)<\/td>\n<td>14290 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>12517 (81.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>12348 (81.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>40196 (66.40)<\/td>\n<td>15207 (80.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>10571 (82.80)<\/td>\n<td>45992 (62.80)<\/td>\n<td><\/td>\n<td>12513 (81.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>6259 (85.60)<\/td>\n<td>21384 (76.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>45592 (63.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td>40457 (66.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>35103 (69.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>24207 (75.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>5870 (85.80)<\/td>\n<td><\/td>\n<td>14108 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>11095 (82.40)<\/td>\n<td><\/td>\n<td>21376 (76.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>18300 (78.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>29351 (72.40)<\/td>\n<td>46821 (62.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>2829 (88.80)<\/td>\n<td>60942 (49.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>10959 (82.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NC<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>13290 (81.20)<\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>DEF<\/td>\n<td>NC<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>12862 (81.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>16620 (79.40)<\/td>\n<td><\/td>\n<td>18190 (78.40)<\/td>\n<td>21991 (76.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>18939 (78.00)<\/td>\n<td>27522 (73.40)<\/td>\n<td>14952 (80.20)<\/td>\n<td>19486 (77.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td>15582 (79.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>18529 (78.20)<\/td>\n<td><\/td>\n<td>14531 (80.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>33433 (70.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>32473 (70.80)<\/td>\n<td><\/td>\n<td>46799 (62.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>55526 (55.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>37987 (67.80)<\/td>\n<td><\/td>\n<td>38210 (67.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>47598 (61.60)<\/td>\n<td>47795 (61.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td>21860 (76.40)<\/td>\n<td><\/td>\n<td>20843 (77.00)<\/td>\n<td><\/td>\n<td>20611 (77.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>ON<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>20892 (77.00)<\/td>\n<\/tr>\n<tr>\n<td>Metallurgical Engineering<\/td>\n<td>REG<\/td>\n<td>NS<\/td>\n<td>27991 (73.20)<\/td>\n<td>41039 (66.00)<\/td>\n<td>52702 (58.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>59240 (51.60)<\/td>\n<td>63115 (45.80)<\/td>\n<td>29614 (72.40)<\/td>\n<td>45129 (63.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>55256 (55.80)<\/td>\n<td><\/td>\n<td>63286 (45.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Metallurgical Engineering<\/td>\n<td>PHC<\/td>\n<td>NS<\/td>\n<td>24221 (75.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Sugar Technology<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>54660 (56.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Sugar Technology<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>38478 (67.52)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<hr>\n<p><a href=\"#fee\">    Fee Structure  |<\/a> <a href=\"#round1\">    Cutoff Round 1  |<\/a> <a href=\"#round2\">    Cutoff Round 2  |<\/a><a href=\"#round3\">    Cutoff Round 3  |<\/a><\/p>\n<hr>\n<div id=\"round3\">\n<h3>Government Polytechnic Kolhapur CAP Round 3 Diploma Cutoff 2019 (Ranks and Merit Percentile)<\/h3>\n<table class=\"borderTable\">\n<tr>\n<th>Department<\/th>\n<th>Special Category<\/th>\n<th>Seat Type<\/th>\n<th>GOPEN                    <\/th>\n<th>GSC<\/th>\n<th>GST<\/th>\n<th>GVJ<\/th>\n<th>GNT1<\/th>\n<th>GNT2                    <\/th>\n<th>GNT3<\/th>\n<th>GOBC<\/th>\n<th>GSEBC<\/th>\n<th>LOPEN<\/th>\n<th>LSC<\/th>\n<th>LST                    <\/th>\n<th>LVJ<\/th>\n<th>LNT1<\/th>\n<th>LNT2<\/th>\n<th>LNT3<\/th>\n<th>LOBC<\/th>\n<th>LSEBC<\/th>\n<th>PHC<\/th>\n<th>TWS                    <\/th>\n<th>DEF<\/th>\n<th>EWS<\/th>\n<th>MI<\/th>\n<th>ORPHAN<\/th>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td>45890 (62.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>16544 (79.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td><\/td>\n<td><\/td>\n<td>9469 (83.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>5296 (86.40)<\/td>\n<td>11030 (82.40)<\/td>\n<td>11844 (82.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>13045 (81.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>11464 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>22450 (76.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>18387 (78.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>17906 (78.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td><\/td>\n<td><\/td>\n<td>18398 (78.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>24767 (75.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>29635 (72.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td>14988 (80.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>23973 (75.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td>15582 (79.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td>16393 (79.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>15092 (80.20)<\/td>\n<td><\/td>\n<td>17270 (79.00)<\/td>\n<td>25091 (74.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>17253 (79.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td>29707 (72.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>31332 (71.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Civil Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td>29361 (72.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>41054 (66.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>1562 (90.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>2309 (89.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td>21132 (76.80)<\/td>\n<td>9912 (83.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>4151 (87.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Information Technology<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>10787 (82.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>13520 (81.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td>5594 (86.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>20550 (77.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>61416 (48.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td>5438 (86.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11074 (82.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electrical Engineering<\/td>\n<td>REG<\/td>\n<td>TS<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11613 (82.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>2923 (88.60)<\/td>\n<td>25085 (74.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>25970 (74.40)<\/td>\n<td>46498 (62.40)<\/td>\n<td>13064 (81.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>28173 (73.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>20705 (77.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td><\/td>\n<td>51312 (59.00)<\/td>\n<td>55220 (55.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>58430 (52.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>28944 (72.60)<\/td>\n<td><\/td>\n<td>28734 (72.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>40228 (66.40)<\/td>\n<td>47462 (61.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Electronics and Telecommunication Engg<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>27313 (73.60)<\/td>\n<td>28924 (72.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>38579 (67.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Industrial Electronics<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td>10526 (82.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>8003 (84.40)<\/td>\n<td><\/td>\n<td>9187 (83.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>14216 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>50673 (60.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>PHC<\/td>\n<td>NH<\/td>\n<td><\/td>\n<td>18939 (78.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TH<\/td>\n<td><\/td>\n<td>15469 (80.00)<\/td>\n<td>35143 (69.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>24507 (75.00)<\/td>\n<td>26881 (73.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>26917 (73.80)<\/td>\n<td><\/td>\n<td>27895 (73.20)<\/td>\n<td>34798 (69.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>13855 (80.80)<\/td>\n<td><\/td>\n<td>14343 (80.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>TO<\/td>\n<td><\/td>\n<td>57442 (53.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>11324 (82.20)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NH<\/td>\n<td>18364 (78.40)<\/td>\n<td>43136 (64.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>38551 (67.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>22131 (76.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Mechanical Engineering<\/td>\n<td>REG<\/td>\n<td>NO<\/td>\n<td><\/td>\n<td>41415 (65.80)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>Metallurgical Engineering<\/td>\n<td>REG<\/td>\n<td>NS<\/td>\n<td>59240 (51.60)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>63286 (45.40)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td>51286 (59.00)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p>For all other institutes Polytechnic Diploma cut offs and other information during 2018 do refer to <a href=\"https:\/\/www.inspirenignite.com\/mh\/maharashtra-polytechnic-diploma-2019-cutoff\/\">Maharashtra polytechnic Diploma 2019 Cutoffs<\/a>. For Questions you can either comment you can ask here or ask on InI forum at <a href=\"https:\/\/www.inspirenignite.com\/forums\/\"> Ask a Question<\/a>.<\/p>\n<p>For regular updates on Diploma Syllabus and other exams do like us on Facebook, follow us on Google Plus and subscribe to feed for email updates.<\/p>\n<p>Dont forget to share with friends.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Government Polytechnic Kolhapur Diploma Cutoff 2019 will give you all updated information on Post SCC Diploma in Engineering and Technology closing rank and closing merit percentile in each CAP round. [&hellip;]<\/p>\n","protected":false},"author":2351,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-6794","post","type-post","status-publish","format-standard","hentry","category-mh-diploma-cutoffs"],"_links":{"self":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/6794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/users\/2351"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/comments?post=6794"}],"version-history":[{"count":0,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/6794\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/media?parent=6794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/categories?post=6794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/tags?post=6794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}