{"id":2964,"date":"2019-11-09T08:50:07","date_gmt":"2019-11-09T08:50:07","guid":{"rendered":"https:\/\/www.inspirenignite.com\/mh\/?p=2964"},"modified":"2019-11-09T09:58:54","modified_gmt":"2019-11-09T09:58:54","slug":"mumbai-university-m-e-second-half-winter-timetable-2019","status":"publish","type":"post","link":"https:\/\/www.inspirenignite.com\/mh\/mumbai-university-m-e-second-half-winter-timetable-2019\/","title":{"rendered":"Mumbai University M.E Second Half Winter Timetable 2019"},"content":{"rendered":"\n<p>Mumbai University (MU) has released M.E second half winter exam timetable 2019.<\/p>\n\n\n\n<p>MU released second half winter exam timetable 2019 for Humanities, Interdisciplinary, Commerce &amp; Management, Science &amp; Technology<\/p>\n\n\n\n<p>Mumbai University concentrated its efforts on controlling teaching at the undergraduate level and in conducting examinations. Later on it took up research and the task of imparting instructions at the Post-Graduate level.<\/p>\n\n\n\n<p>Here we update various universities&nbsp;<a href=\"https:\/\/www.inspirenignite.com\/mh\/?s=time+table\">timetable<\/a>, syllabus, result, and more over you can refer&nbsp;<a href=\"https:\/\/www.inspirenignite.com\/mh\/category\/mhtcet-cutoff\/\">MHTCET<\/a>&nbsp;cutoffs and many more updates time to time.<\/p>\n\n\n\n<p>Mumbai University M.E Second Half Winter Timetable 2019 for Sem I &amp; II links are given below. Students can download the pdf by clicking on particular sem. Students are requested to look at timetable pdf carefully its date of exams and time. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Mumbai University M.E Second Half Winter Timetable 2019 Sem I given below<\/h4>\n\n\n\n<table class=\"wp-block-table\"><tbody><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T04411.pdf\" target=\"_blank\" rel=\"noopener\">1T04411 M.E. (ARTIFICIAL ENGINEERING) (Choice Base) SEMESTER &#8211; I<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T019111.pdf\" target=\"_blank\" rel=\"noopener\">1T01911\n  M.E. Biomedical Engg. (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T020111.pdf\" target=\"_blank\" rel=\"noopener\">1T02011\n  M.E.Chemical Engg. (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T021111.pdf\" target=\"_blank\" rel=\"noopener\">1T02111\n  M.E.Civil Engg. Construction Engg. &amp; Management (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T022111.pdf\" target=\"_blank\" rel=\"noopener\">1T02211\n  M.E.Civil Engg. Structural Engg Subject (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T023111.pdf\" target=\"_blank\" rel=\"noopener\">1T02311\n  M.E.Civil Engg. Water Resources Engg.Subject (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T024111.pdf\" target=\"_blank\" rel=\"noopener\">1T02411\n  M.E.Computer Engg. (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T025111.pdf\" target=\"_blank\" rel=\"noopener\">1T02511\n  M.E.Computer Network &amp; Information Security (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T026111.pdf\" target=\"_blank\" rel=\"noopener\">1T02611\n  M.E.Electrical Engg. Power Electronics &amp; Drives (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T028111.pdf\" target=\"_blank\" rel=\"noopener\">1T02811\n  M.E.Electrical Engg. Power System Engg.(Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T029111.pdf\" target=\"_blank\" rel=\"noopener\">1T02911\n  M.E.Electronics &amp; Telecommunication Engg. (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T030111.pdf\" target=\"_blank\" rel=\"noopener\">1T03011\n  M.E.Electronics Engg. (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T031111.pdf\" target=\"_blank\" rel=\"noopener\">1T03111\n  M.E.I. T. Information Security Subject (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T032111.pdf\" target=\"_blank\" rel=\"noopener\">1T03211\n  M.E.I.T. with Specialization In Information &amp; Cyber Warfare (Sem.\n  I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T033111.pdf\" target=\"_blank\" rel=\"noopener\">1T03311\n  M.E.Information Technology (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T034111.pdf\" target=\"_blank\" rel=\"noopener\">1T03411\n  M.E.Instrumentation &amp; Control Engg.(Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T035111.pdf\" target=\"_blank\" rel=\"noopener\">1T03511\n  M.E.Instrumentation (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T036111.pdf\" target=\"_blank\" rel=\"noopener\">1T03611\n  M.E.Mechanical Engg. CAD\/CAM &amp; Robotics (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T037111.pdf\" target=\"_blank\" rel=\"noopener\">1T03711\n  M.E.Mechanical Engg. Energy Systems &amp; Management (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T038111.pdf\" target=\"_blank\" rel=\"noopener\">1T03811\n  M.E.Mechanical Engg. Heat Power (Sem. I)(Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T039111.pdf\" target=\"_blank\" rel=\"noopener\">1T03911\n  M.E.Mechanical Engg. Machine Design(Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T040111.pdf\" target=\"_blank\" rel=\"noopener\">1T04011\n  M.E.Mechanical Engg. Manufacturing Systems Engg. (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T041111.pdf\" target=\"_blank\" rel=\"noopener\">1T04111\n  M.E.Mechanical Engg. Product Design&amp; Development(Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T042111.pdf\" target=\"_blank\" rel=\"noopener\">1T04211\n  M.E.Mechanical Engg. ThermalEngg. (Sem. I) (Choice Base)<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T043111.pdf\" target=\"_blank\" rel=\"noopener\">1T04311   M.E.Signal Processing (Sem. I)(Choice Base)<\/a><br><\/td><\/tr><\/tbody><\/table>\n\n\n\n<h4 class=\"wp-block-heading\">Mumbai University M.E Second Half Winter Timetable 2019 Sem II given below<\/h4>\n\n\n\n<table class=\"wp-block-table\"><tbody><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T019121.pdf\" target=\"_blank\" rel=\"noopener\">1T01912\n  M.E. (BIO-MEDICAL ENGG.) (Choice Based Credit &amp; Grading System) SEMESTER\n  &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T020121.pdf\" target=\"_blank\" rel=\"noopener\">1T02012\n  M.E. (CHEMICAL)(Choice Based Credit &amp; Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T021121.pdf\" target=\"_blank\" rel=\"noopener\">1T02112\n  M.E. (CIVIL)(CONSRTUCTION ENGG. &amp; MANAGEMENT)(Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T022121.pdf\" target=\"_blank\" rel=\"noopener\">1T02212\n  M.E. (CIVIL) STRU.ENGG. (Choice Based Credit &amp; Grading System) SEMESTER &#8211;\n  II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T023121.pdf\" target=\"_blank\" rel=\"noopener\">1T02312\n  M.E. (CIVIL) (WATER RESOURCES ENGG.) (Choice Based Credit &amp; Grading\n  System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T024122.pdf\" target=\"_blank\" rel=\"noopener\">1T02412\n  M.E. (COMPUTER ENGG.) (Choice Based Credit &amp; Grading System) SEMESTER &#8211;\n  II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T025121.pdf\" target=\"_blank\" rel=\"noopener\">1T02512\n  M.E. (COMPUTER NETWORK &amp; INFO. SECURITY ENGG.) (Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T026121.pdf\" target=\"_blank\" rel=\"noopener\">1T02612\n  M.E.(ELECTRICAL ENGG.)(POWER ELECTRONICS &amp; DRIVES) (Choice Based Credit\n  &amp; Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T028121.pdf\" target=\"_blank\" rel=\"noopener\">1T02812\n  M.E. (ELECTRICAL WITH POWER SYSTEM ENGG.)(Choice Based Credit &amp; Grading\n  System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T029121.pdf\" target=\"_blank\" rel=\"noopener\">1T02912\n  M.E. (ELECTRONICS &amp; TELECOMMUNICATION ENGG.) (Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T030121.pdf\" target=\"_blank\" rel=\"noopener\">1T03012\n  M.E. (ELECTRONICS ENGG.) (Choice Based Credit &amp; Grading System) SEMESTER\n  &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T031121.pdf\" target=\"_blank\" rel=\"noopener\">1T03112\n  M.E. (I.T.)(INFORMATION SECURITY)(Choice Based Credit &amp; Grading System)\n  SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T032121.pdf\" target=\"_blank\" rel=\"noopener\">1T03212\n  M.E. (I.T.) (INFORMATION AND CYBER WARFARE) (Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T033121.pdf\" target=\"_blank\" rel=\"noopener\">1T03312\n  M.E. (INFORMATION TECHNOLOGY) (Choice Based Credit &amp; Grading System)\n  SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T034121.pdf\" target=\"_blank\" rel=\"noopener\">1T03412\n  M.E. (INSTRUMENTATION AND CONTROLS ENGG.)(Choice Based Credit &amp; Grading\n  System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T035121.pdf\" target=\"_blank\" rel=\"noopener\">1T03512\n  M.E.(INSTRUMENTATION)(Choice Based Credit &amp; Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T036121.pdf\" target=\"_blank\" rel=\"noopener\">1T03612\n  M.E. (MECH. ENGG. WITH CAD\/CAM &amp; ROBOTICS)(Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T037121.pdf\" target=\"_blank\" rel=\"noopener\">1T03712\n  M.E. (MECH.) (ENERGY SYSTEMS &amp; MANAGEMENT) (Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T038121.pdf\" target=\"_blank\" rel=\"noopener\">1T03812\n  M.E. (MECH.) (HEAT POWER ENGG.) (Choice Based Credit &amp; Grading System)\n  SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T039121.pdf\" target=\"_blank\" rel=\"noopener\">1T03912\n  M.E. (MECH.) (MACHINE DESIGN)(Choice Based Credit &amp; Grading System)\n  SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T040121.pdf\" target=\"_blank\" rel=\"noopener\">1T04012\n  M.E. (Mech.) (MANUFACTURING SYSTEMS ENGG.) (Choice Based Credit &amp; Grading\n  System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T041121.pdf\" target=\"_blank\" rel=\"noopener\">1T04112\n  M.E. (MECH.)(PRODUCT DESIGN &amp; DEVELOPMENT)(Choice Based Credit &amp;\n  Grading System) SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T042121.pdf\" target=\"_blank\" rel=\"noopener\">1T04212\n  M.E.(MECH.) (THERMAL ENGG.)(Choice Based Credit &amp; Grading System)\n  SEMESTER &#8211; II<\/a><\/td><\/tr><tr><td><a href=\"http:\/\/old.mu.ac.in\/wp-content\/uploads\/2014\/11\/1T043121.pdf\" target=\"_blank\" rel=\"noopener\">1T04312\n  M.E. (SIGNAL PROCESSING ENGG.)(Choice Based Credit &amp; Grading System)\n  SEMESTER &#8211; II<\/a><\/td><\/tr><\/tbody><\/table>\n\n\n\n<p>All other notification and new updates&nbsp;keep visiting&nbsp;<a href=\"https:\/\/www.inspirenignite.com\/mh\/\">InI All About Education in Maharashtra<\/a>&nbsp;Subscribe, like us on facebook and don\u2019t forget to download our app&nbsp;<a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy&amp;pcampaignid=MKT-Other-global-all-co-prtnr-py-PartBadge-Mar2515-1\" target=\"_blank\" rel=\"noopener\">iStudy<\/a><\/p>\n\n\n\n<p>Wish you All Good Luck !!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai University (MU) has released M.E second half winter exam timetable 2019. MU released second half winter exam timetable 2019 for Humanities, Interdisciplinary, Commerce &amp; Management, Science &amp; Technology Mumbai [&hellip;]<\/p>\n","protected":false},"author":2259,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[28,23],"tags":[],"class_list":["post-2964","post","type-post","status-publish","format-standard","hentry","category-mu","category-exam-timetable"],"_links":{"self":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/2964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/users\/2259"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/comments?post=2964"}],"version-history":[{"count":4,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/2964\/revisions"}],"predecessor-version":[{"id":2974,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/2964\/revisions\/2974"}],"wp:attachment":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/media?parent=2964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/categories?post=2964"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/tags?post=2964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}