{"id":28861,"date":"2025-04-14T11:27:31","date_gmt":"2025-04-14T05:57:31","guid":{"rendered":"https:\/\/www.inspirenignite.com\/mh\/332002-industrial-training-or-project-1-syllabus-for-mining-engineering-3rd-sem-k-scheme-msbte-pdf\/"},"modified":"2025-04-14T11:27:31","modified_gmt":"2025-04-14T05:57:31","slug":"332002-industrial-training-or-project-1-syllabus-for-mining-engineering-3rd-sem-k-scheme-msbte-pdf","status":"publish","type":"post","link":"https:\/\/www.inspirenignite.com\/mh\/332002-industrial-training-or-project-1-syllabus-for-mining-engineering-3rd-sem-k-scheme-msbte-pdf\/","title":{"rendered":"332002: Industrial Training or Project 1 Syllabus for Mining Engineering 3rd Sem K Scheme MSBTE PDF"},"content":{"rendered":"<p align=\"justify\">Industrial Training or Project 1 detailed Syllabus for Mining Engineering (MZ), K scheme PDF has been taken from the <a href=\"https:\/\/econtent.msbte.edu.in\/curriculum_search\/\" style=\"color: inherit\" target=\"_blank\" rel=\"noopener\">MSBTE<\/a> official website and presented for the diploma students. For Subject Code, Subject Name, Lectures, Tutorial, Practical\/Drawing, Credits, Theory (Max &amp; Min) Marks, Practical (Max &amp; Min) Marks, Total Marks, and other information, do visit full semester subjects post given below. <\/p>\n<p align=\"justify\">For all other MSBTE Mining Engineering 3rd Sem K Scheme Syllabus PDF, do visit <a href=\"..\/msbte-mining-engineering-3rd-sem-k-scheme-syllabus-pdf\/\">MSBTE Mining Engineering 3rd Sem K Scheme Syllabus PDF Subjects<\/a>. The detailed Syllabus for industrial training or project 1 is as follows.<\/p>\n<p><h4>Rationale<\/h4>\n<p id=\"istudy\" style=\"text-align:center\">For the complete Syllabus, results, class timetable, and many other features kindly download the <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\/\" target=\"_blank\" rel=\"noopener\">iStudy App<\/a><br \/><b> It is a lightweight, easy to use, no images, and no pdfs platform to make students&#8217;s lives easier.<\/b><br \/><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy&amp;pcampaignid=pcampaignidMKT-Other-global-all-co-prtnr-py-PartBadge-Mar2515-1\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"https:\/\/play.google.com\/intl\/en_us\/badges\/static\/images\/badges\/en_badge_web_generic.png\" alt=\"Get it on Google Play\" style=\"height:65px\"><\/a>.<\/p>\n<p><h4>Course Outcomes:<\/h4>\n<p>Students will be able to achieve &amp; demonstrate the following COs on completion of course based learning<\/p>\n<ol>\n<li>Adhere mine safety practices as per statutes.<\/li>\n<li>Get acquainted with mine working environment.<\/li>\n<li>Carryout survey related to wining and working processes.<\/li>\n<li>Perform allotted work as vocational trainee.<\/li>\n<li>Prepare and present industrial training report based on work experience.<\/li>\n<\/ol>\n<p><h4>Practical \/ Tutorial Experiences<\/h4>\n<ol>\n<li>2. Collection of general information of underground mine like: \tName of the Mine \tName of the Owner \tName of the project officer \/ manager \tDuration of training \tNature of training \tLocation of Mine \tMode of entry &#8211; there number and type.<\/li>\n<li>Collection of information related to geology of the underground mine. \tBore hole section, showing different strata overlying the seam \tDepth of the seam from surface \tNumber of coal seam &amp; their average thickness. Dip of working seam :- flat \/ moderate incline \/ steeply incline Strike length of seam \tNature of roof \tNature of floor \tDetails of presence of major fault \/ fold if any. Geological Map of the Mine.<\/li>\n<li>Collection of information related to drilling work in underground mine: \tName of drilling machine and its specification voltage rating, type of motor used, pilot circuit for operation its importance. \tType of drill machine &#8211; rotatory or percussive Type of drill rod, its length, Arrangement for fixing drill bit Type of drill bit, Diameter of drill hole in mm. Average time taken to drill one hole. \tNo. of holes drilled on face with size of face width x height.<\/li>\n<li>Collection of information related to blasting in underground mine: \tName of explosive used &#8211; i) During development ii) During depillaring \tType of explosive used \tWeight of cartridge \tDiameter of cartridge \tLength of cartridge \tCharge per hole \tTotal explosive charged in single face \/ single hole \tStemming material used \tType of initiation &#8211; direct\/indirect \tType of detonator used &#8211; its construction details and specification. \tStudy of following blasting tools. \tExploder &#8211; its name, type &#8211; magneto or battery condenser capacity in terms of round it can blast at a time, operating details &#8211; direction of key \tCircuit tester for continuity, crimper, Scraper, Crack detector, Stemming rod \tPowder factor and Detonator factor.<\/li>\n<li>Collection of the information regarding various type of underground mine support: \tName of support &#8211; prop \/ chock \/ cog \/ cross-bar \/ safari support \/ roof stitching \/ roof bolting \/ friction prop \/ hydraulic prop \/ brick walling \/ any other type. \tType of support &#8211; permanent \/ semi permanent \/ temporary \tMethod of erecting each type of support. \tLoad bearing capacity of support &#8211; in case of hydraulic support i) Yield load and ii) Setting load. Additional information to be collected in case of \tProp support &#8211; dimensions of lid, wedge, and base plate (if exit) \tChock \/ cog support &#8211; dimensions of sleepers used, pressure releasing devise (if installed) \tRoof bolting &#8211; type of roof bolt, depth of hole, if mortar (mixture of sand and cement) is used sand: cement ratio. \tSystematic support rules of the mine. &#8211; Copy should be obtained. \tWithdrawal of supports &#8211; study the various type of safety devices used in withdrawing the support. Good sketches of all types of supports should be brought with dimensions work with Limba Misty on the faces for few days.<\/li>\n<li>Collection of the information related to underground mine panel development: \tType of development :- Dip \/ Strike \/ cross &#8211; cut development \tHeight of gallery : \tWidth of gallery at face : \tDimensions of pillar :- \tShape of pillar : _ square \/ rectangle \tNumber of district \/ panel \tNumber of pillar in each panel \tType of panel : closed \/ open \tIncubation period :- \tIf mechanized development then in addition to above information following information is to be collected. \tName of the loading machine \tBucket capacity \tFill factor \tType \/ crawler mounted \tLoading capacity per day \tTransportation from the face chain conveyer \/ tubs \/shuttle cars \tCycle of different operation on the faces: 1. Operation involved 2. Their Sequence 3. Time taken for each individual operation 4. Man power require for each operation 5. Production form each face \/ of dimension \/ progress per blast 6. Production of district \/ No of faces worked for meeting that manpower require \/ O.M.S of\tthe district &amp; faces<\/li>\n<li>Collection of following information related to depillaring of underground mine panel: \tMethod of depillaring \tSize of split \tSize of stook \tLine of extraction \tPreparatory arrangement before depillaring \tSystematic support rules (S. S. R.) \tType of depillaring: by stowing \/ by caving. 1. If stowing: &#8211; general stowing arrangements stowing bunker location, water : sand ratio, signaling arrangements 2. If caving: &#8211; air blast &amp; general precautions taken to prevent air blasts.<\/li>\n<li>Conduction of underground mine ventilation survey: \tFan House: \tType of fan &#8211; 1. Centrifugal &#8211; backward bladed or forward bladed 2. Coaxial flow &#8211; Single stage or No. of stages \tManufacture \tDiameter of fan \tNo. of blades \tRotations per minutes (RPM) \tWater gauge developed \tMotor and transmission details: 1. Specifications of motor &#8211; HP\/kW, volts. R.P.M. 2. Transmission &#8211; Reduction Ratio, Type 3. Sketch of motor to fan transmission.  Water gauge 1. Construction, 2. Sketch of instrument showing how it is fitted in the fan house. 3. Reading of instrument \tFan Drift &#8211; size &#8211; width * height length inclination \tEvasee chimney &#8211; sketch with dimensions &#8211; top &amp; bottom \tAir Lock doors &#8211; arrangement &amp; to understand how the at fan house reversal of air is arranged. Sketching the arrangements for the following ventilation appliances with dimensions. \tVentilation stoppings. \tVentilation doors &#8211; In haulage roadways and in other gallery \tAir crossing :- \tAir lock doors underground \tIf available regulators \tIf available fire stopping &#8211; its specifications, fitting preparatory stoppings in depillaring area. \tInspection of stoppings by supervisors \/ assistant Managers. \tIntake airway and downcast shaft. \tUpcast shaft and return airway \tStudy ventilation plan to see the distribution of air inside the mines, splits, ventilation districts. \tStudy of auxiliary fan arrangement if installed and precautions.Specifications of fan, specification of tubing&#8217;s, layouts. Ventilation Measurements: \tMeasurement of quantity flowing 1. Anemometer 2. Velometer  Measurement of humidity 1. Hygrometer 2. Katathermometer<\/li>\n<li>Collection of information related to underground mining machinery: Transportation: \tGeneral haulage system :- Rope haulage \/ belt conveyor \tNumber of haulages \tType of each haulages \tCapacity or rating of each haulage motor \tSafety appliances used on each haulage like i) Stop block, ii) Run away switch, iii)drag iv) Pull Cord. &#8211; Draw Sketches with dimension to be brought. \tSignalling arrangement and code of signals \tOther haulage features like i) Re-railer ii) Manholes iii) Tub arrester iv) Pullcord system in case of conveyor. v) Rollers. \tType of haulage rope &#8211; no of strands, splicing of ropes \tSurface tippler &#8211; its layouts, tipping arrangements \tTrack, crosses, sleepers, Track fillings. Method of laying track &#8211; work with track layer for few days. Pumping Arrangement: \tType of different pumps used in the mines their i) Head, ii) H. P. &#8211; Study the Literature available in mech. Department. \tElectrical switches &#8211; detail. \tStarting &amp; stopping of pump. \tSketch general arrangement &#8211; starting from strainer \/ foot value, suction pipe, pump, delivery pipe, delivery valve, \tArrangement for priming of the pump. \tSketch of tub with name of the parts &amp; its capacity \tCouplings, Sockets, clips etc used with haulage \tNo of tubs (loaded &amp; empty) attached to different capacity haulage. Mine Shaft: \tNo. of shafts \tFinished diameter of each shaft. \tType of lining \tShape of shaft \tHeadgear &#8211; General construction \tType of head gear winding- \tNo. of cage \tVarious safety appliances like &#8211; i) Safety hook (type) ii) Automatic contrivance iii) Cage arrester, \tConstruction and use of keps \tGuides &#8211; type, and its use<\/li>\n<li>Collection of the information related to surface features of underground mine: \tLamp room layout &#8211; cap lamp, \tExplosive Magazine &#8211; precautions taken to prevent pilferage of explosive \tStore room &#8211; general procedure of issuing store material \tWinding engine room<\/li>\n<li>13. Collection of general information of surface mine like: \tName of the Mine \tName of the Owner \tName of the project officer \/ manager \tDuration of training \tNature of training \tLocation of Mine \tMode of entry &#8211; there number and type<\/li>\n<li>Collection of information related to geology of surface mine: \tBore hole section, showing different strata overlying the seam \tDepth of the seam from surface \tNumber of coal seam &amp; their average thickness. \tDip of working seam :- flat \/ moderate incline \/ steeply incline \tStrike length of seam \tDetails of presence of major fault \/ fold if any \tGeological Map of the Mine.<\/li>\n<li>Mine Opening: \tSite preparations \tType of entry \tMine layout \tStatutory provisions &amp; permissions w.r.t. mine opening. Method Of Working: \tType of mechanisation (manual, semi-mechanised, mechanised) \tManpower requirement \tBench geometry: Height, width, slope, ultimate pit slope, haulroad preparation. \tROM handling from mines to processing plant. \tStatutory permissions and provisions w.r.t. method of working. \tMonsoon preparations.<\/li>\n<li>Drilling and Blasting in surface mining: \tBlast geometry: Spacing, burden, length &amp; diameter of drill hole, subgrade drill, stemming, explosive charge per hole, powder factor, column charge, priming charge, deck charging, etc. \tType of explosive used, its specifications, bulk explosive and cartridge explosives. \tType of initiation system of explosives, accessories used in explosives initiations, their specifications, blast initiation pattern and connections. \tBlasting procedure and precautions. \tStatutory permissions w.r.t. blasting. \tArrangement for storage and transportation of explosives. \tStatutory permissions and provisions w.r.t. storage and transportation of explosives.<\/li>\n<li>Surface Mining Machinery Construction, Working principle, Specifications and Applications of Machineries used in the respective mine: \tScraper \tDozer &amp; Ripper \tMotor grader \tRoller \tDrill Machines \tExcavators (Rope &amp;\/or Hydraulic) \tDumpers &amp;\/or Tippers \tConveyors \tExplosive van \tWater tankers \/ sprinklers \tRock breaker \tBackhoe \tOther machineries.<\/li>\n<li>Environmental Impacts &amp; measurements: \tTypes of environmental impacts \tMeasurement of ground vibrations. \tPrecautionary measures of ground vibration, fly rock, air blast at mines site. \tPrecautionary measures to reduce air-water-land pollution at mines site. \tLand reclamation procedure. \tEIA &amp; EMP<\/li>\n<li>Preparation of industrial training report in standard format, which includes following: \tTitle Page which includes: Title, Purpose of submission, Institute logo, Students Name, Industry Name, Department and Institute Name \tCertificates: Student declaration, Certificate from industry \tAcknowledgement \tText \tIntroduction to Industry \tSafety Practices in Industry \tIndustrial Process and collected information \tWorking Experience \tResults \tSummary\/Conclusion. References<\/li>\n<li>Presentation of industrial training report.<\/li>\n<\/ol>\n<p><h4>Study Project<\/h4>\n<p id=\"istudy\" style=\"text-align:center\">For the complete Syllabus, results, class timetable, and many other features kindly download the <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\/\" target=\"_blank\" rel=\"noopener\">iStudy App<\/a><br \/><b> It is a lightweight, easy to use, no images, and no pdfs platform to make students&#8217;s lives easier.<\/b><br \/><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy&amp;pcampaignid=pcampaignidMKT-Other-global-all-co-prtnr-py-PartBadge-Mar2515-1\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"https:\/\/play.google.com\/intl\/en_us\/badges\/static\/images\/badges\/en_badge_web_generic.png\" alt=\"Get it on Google Play\" style=\"height:65px\"><\/a>.<\/p>\n<p><h4>Learning Materials \/ Books<\/h4>\n<ol>\n<li>R. D. Singh\tPrinciples &amp; Practices of Modern Coal Mining\t\tNew Age International (P) Limited, Publishers, New Delhi ISBN: 81-224-0974-1<\/li>\n<li>Heartman L. Howard\tIntroductory Mining Engineering\t\tJohn Wiley&amp; Sons, New York, ISBN: 0-47162804-2<\/li>\n<li>S. D. Prasad &amp; Rakesh\tLegislation in Indian Mines: A Critical Appraisal (Volume &#8211; I &amp; II) \tVivek P-8, New Medical Enclave. B.H.U., Varanasi &#8211; 221005.<\/li>\n<\/ol>\n<p><h4>Learning Websites &amp; Portals<\/h4>\n<ol>\n<li>https:\/\/www.mining-journal.com\/category\/projects\tResearch paper publication on Mining Projects.<\/li>\n<li>http:\/\/www.infomine.com\/library\/publications\tWebinar publications on Mining Projects.<\/li>\n<li>https:\/\/www.mining-technology.com\/?cf-view\tPublications on foreign mining practices.<\/li>\n<\/li>\n<\/ol>\n<p align=\"justify\">For detail Syllabus of all other subjects of Mining Engineering, K scheme do visit <a href=\"..\/category\/msbte\/mz\/\">Mining Engineering 3rd Sem Syllabus for K scheme<\/a>.<\/p>\n<p align=\"justify\">For all Mining Engineering results, visit <a href=\"https:\/\/www.inspirenignite.com\/mh\/msbte-results\/\">MSBTE Mining Engineering all semester results<\/a> direct links.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Industrial Training or Project 1 detailed Syllabus for Mining Engineering (MZ), K scheme PDF has been taken from the MSBTE official website and presented for the diploma students. For Subject [&hellip;]<\/p>\n","protected":false},"author":2351,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[117,164],"tags":[],"class_list":["post-28861","post","type-post","status-publish","format-standard","hentry","category-3rd-sem-msbte","category-mz"],"_links":{"self":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/28861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/users\/2351"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/comments?post=28861"}],"version-history":[{"count":0,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/posts\/28861\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/media?parent=28861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/categories?post=28861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/mh\/wp-json\/wp\/v2\/tags?post=28861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}