Manufacturing Planning and Control detailed syllabus scheme for Production Engineering (PE), 2018 regulation has been taken from the MU official website and presented for the Bachelor of Engineering students. For Course Code, Course Title, Test 1, Test 2, Avg, End Sem Exam, Team Work, Practical, Oral, Total, and other information, do visit full semester subjects post given below.
For 6th Sem Scheme of Production Engineering (PE), 2018 Pattern, do visit PE 6th Sem Scheme, 2018 Pattern. For the Department Level Optional Course-2 scheme of 6th Sem 2018 regulation, refer to PE 6th Sem Department Level Optional Course-2 Scheme 2018 Pattern. The detail syllabus for manufacturing planning and control is as follows.
Manufacturing Planning and Control Syllabus for Production Engineering TE 6th Sem 2018 Pattern Mumbai University
Course Objectives:
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Course Outcomes:
Learner will be able to..
- Analyze all aspects of a successful manufacturing planning and control infrastructure.
- Design demand management scheme.
- Illustrate the significance of sales and operations planning.
- Design and oversee an effective master production schedule.
- Design materials requirements planning.
- Analyze capacity planning and management.
Module 1
MPC concept and Significance Typical MPC support activities. An MPC system framework matching, MPC system with the needs of the firm, Evaluation of the MPC system. 06
Module 2
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Module 3
- Aggregate Planning Overview of the Aggregate Planning Problem, Costs in Aggregate Planning, Evaluation of various strategy, Modelling Management behaviour, Disaggregating Aggregate Plans, Practical Considerations
- Master Production Scheduling The MPS activity, The MPS techniques, Bill of Materials Structuring for the MPS, The final assembly schedule, MPS stability. 06
Module 4
- Capacity Planning and Utilisation The role of Capacity Planning in MPC, Capacity Planning and control Techniques, Rough-cut Capacity Planning, Scheduling Capacity and Materials, Management and Capacity Planning Utilisation.
- Production Activity and Control (PAC) A framework for PAC, PAC Techniques. 08
Module 5
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Module 6
Advanced concepts in MRP, ERP, JIT and Scheduling, MPC implementation. 06
Assessment:
Internal Assessment for 20 marks: Consisting Two Compulsory Class Tests First test based on approximately 40% of contents and second test based on remaining contents (approximately 40% but excluding contents covered in Test I) End Semester Examination: Weightage of each module in end semester examination will be proportional to number of respective lecture hours mentioned in the curriculum.
- Question paper will comprise of total six questions, each carrying 20 marks
- Question 1 will be compulsory and should cover maximum contents of the curriculum
- Remaining questions will be mixed in nature (for example if Q.2 has part
- from module 3 then part
- will be from any module other than module 3)
- Only Four questions need to be solved
Reference Books:
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
For detail Syllabus of all subjects of Production Engineering (PE) 6th Sem 2018 regulation, visit PE 6th Sem Subjects of 2018 Pattern.