4th Sem, CS

314313: Estimating, Costing and Valuation Syllabus for Construction Technology 4th Sem K Scheme MSBTE PDF

Estimating, Costing and Valuation detailed Syllabus for Construction Technology (CS), K scheme PDF has been taken from the MSBTE official website and presented for the diploma students. For Subject Code, Subject Name, Lectures, Tutorial, Practical/Drawing, Credits, Theory (Max & Min) Marks, Practical (Max & Min) Marks, Total Marks, and other information, do visit full semester subjects post given below.

For all other MSBTE Construction Technology 4th Sem K Scheme Syllabus PDF, do visit MSBTE Construction Technology 4th Sem K Scheme Syllabus PDF Subjects. The detailed Syllabus for estimating, costing and valuation is as follows.

Rationale

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Course Outcomes:

Students will be able to achieve & demonstrate the following COs on completion of course based learning

  1. Use the relevant modes of measurements for the given item of work.
  2. Prepare approximate estimate of a civil engineering works.
  3. Prepare detailed estimate of a civil engineering works.
  4. Fix the rate for the given item of work using relevant rate analysis technique.
  5. Conduct the process of the valuation for the specified purpose.

Unit I

Basics of Estimating and costing 1.1 Introduction: Estimating, Types and purpose, costing, Administrative Approval, Technical Sanction and Budget provision. 1.2 Roles and responsibility of Estimator. 1.3 SSR: Meaning, Purpose, Checklist and Detailed Specification of items of work in load bearing and framed structure as per the Execution. 1.4 Modes of measurement and desired accuracy in measurements of different items of work as per IS: 1200. 1.5 Rules for deduction in Masonry work, Plastering and Pointing and Painting work as per IS: 1200. 1.6 Standard formats of Measurement sheet, Abstract sheet, Face sheet.

Suggested Learning Pedagogie
Lecture Usin Chalk-Board Presentations Video Demonstratio

Unit II

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Unit III

Preparation of Detailed Estimate 3.1 Detailed Estimate: Definition and Purpose, Data required for detailed estimate, Procedure of preparation of detailed estimate, taking out quantities and Abstracting in prescribed format. 3.2 Types and Uses of detailed Estimates: Revised estimate, supplementary estimate, revised and supplementary estimate, repair and maintenance estimate. 3.3 Methods of Detailed Estimate- a) Unit quantity method and total quantity method. b) Long wall and Short wall method (out to out and in to in method or PWD method), Centre line method. 3.4 Calculate the quantities of the given items for the given load bearing structure. 3.5 Calculate the quantities of the given items for the given RCC framed structure. 3.6 Bar bending schedule, Rebar: Meaning, Purposes. 3.7 Steel requirement for footing, column, beam, Lintel, chajja and slab, Determination of rebar quantities as per IS 2502:1963. 3.8 Provisions in detailed estimate: contingencies, work charged establishment, centage charges, water supply and sanitary Charges and electrification charges. 3.9 Earthwork : Quantities for roads, Bunds and canal by Mid sectional area method, Mean sectional area method, Prismoidal formula method and trapezoidal formula method.

Suggested Learning Pedagogie
Lecture Usin Chalk-Board Presentations Video Demonstratio Site/Industry Case Study

Unit IV

Rate Analysis 4.1 Rate Analysis: Definition, purpose, importance and factors affecting. 4.2 Sundry Expenses: Lead (Standard and Extra), lift, overhead charges, water charges and contractors profit. 4.3 Procedure of rate analysis market rate determination etc. 4.4 Task work- Definition, factors Affecting, types, Task work of different skilled labor for different items. 4.5 Categories of labors, their daily wages, types and number of labors for different items of work. 4.6 Preparing rate analysis of different items of work: PCC, RCC work in (column, beam, lintel, slab), brick masonry, stone masonry, Vitrified tile flooring, plastering.

Suggested Learning Pedagogie
Lecture Usin Chalk-Board Presentations Video Demonstratio Flipped Classroom

Unit V

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

List of Experiments:

  1. Prepare the checklist of items from given drawing. 2 C
  2. *Analysis of SSR for any five item of construction. 2 C
  3. *Prepare approximate estimate by using service unit method. 2 C
  4. *Prepare approximate estimate by using Typical bay method. 2 C
  5. *Determine the quantities for Excavation, PCC ,UCR, DPC of 1BHK load bearing residential building using long wall short wall method. (Part I) 2 C
  6. *Determine the quantities for Brick Work, Plastering, flooring, slab of 1BHK load bearing residential building using long wall short wall method. (Part II) 2 C
  7. Determine the quantities for Excavation, PCC ,UCR,DPC of 1BHK load bearing residential building using Center line method (Part I). 2 C
  8. Determine the quantities for Brick Work, Plastering, flooring, slab of 1BHK load bearing residential building using Center line method (Part II). 2 C
  9. *Prepare detailed estimate with abstract for RCC (G+1) residential framed structure. (Part I) (Manual) 2 C
  10. *Prepare detailed estimate with abstract for RCC (G+1) residential framed structure. (Part II) (Manual) 2 C
  11. *Prepare detailed estimate with abstract for RCC (G+1) residential framed structure using relevant available open source Software.(Part-I) 2 C
  12. Prepare detailed estimate with abstract for RCC (G+1) residential framed structure using relevant available open source software.(Part-II) 2 C
  13. Prepare the bar bending schedule with reinforcement estimate for the footing of given structure. 2 C
  14. *Prepare the bar bending schedule with reinforcement estimate for the column of given structure. 2 C
  15. Prepare the bar bending schedule with reinforcement estimate for the beam of given structure. 2 C
  16. *Prepare the bar bending schedule with reinforcement estimate for the slab of given structure. 2 C
  17. Prepare the bar bending schedule with reinforcement estimate for rebaring of beam to be extended. 2 C
  18. Prepare the bar bending schedule with reinforcement estimate for rebaring of column to be extended. 2 C
  19. *Determine the earth work quantity in embankment and cutting using Trapezoidal method. 2 C
  20. Determine the earth quantity in embankment and in cutting using Prismoidal method. 2 C
  21. *Determine the earth work quantity in embankment and in cutting using mid sectional area method. 2 C
  22. Determine the earth work quantity in embankment and cutting using mean area method. 2 C
  23. Prepare the detailed estimate of W.B.M. Road using relevant open source software (Part I) 2 C
  24. Prepare the detailed estimate of W.B.M. Road using relevant open source software (Part II) 2 C
  25. Prepare the detailed estimate for small septic tank 2 C
  26. *Prepare the rate analysis for the given five item of work. 2 C
  27. *Carry out survey and prepare a report on different Categories and types of labor required for completion of various items of work on site. (visit and compare any three sites). 2 C
  28. Create a chart reflecting all values pertaining to valuation of residential building with their significance. 2 C
  29. *Prepare the valuation report for the given building. 2 C
  30. *Determine the monthly rent of the given area of building from the given data. 2 C

Self Learning

Micro Project

  • Enlist the minimum ten salient provisions made in IS:1200 with special reference to load bearing structure.
  • Enlist the minimum ten salient provisions made in IS:1200 with special reference to Framed structure.
  • Prepare detailed estimate of minimum one load bearing structure using available open source software.
  • Rate analysis by analyzing no of labor required for different items of civil works such as 10 cu. m excavatio cement concrete in foundation, Bricks work, rubble stone masonry works. Etc. and 100 m2 12mm thick plaster mm thick Damp proof course, cement pointing, white washing etc.
  • Collect the rebar reinforcement drawings of minimum one building and interpret the drawings with report.
  • Prepare rate analysis of Painting work for OBD, Plastic emulsion, Oil paint, luster paint having minimum 1 area.
  • Prepare approximate estimate of minimum one residential building.
  • Prepare valuation report of minimum one residential building.
  • Workout quantities of cement, sand and bricks for 30 m3,40m3.50m3,60m3 in cement mortar 1:6

Laboratory Equipment

For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Learning Materials

  1. Datta, B.N. Estimating and Costing in Civil engineering UBS Publishers Distributors Pvt. Ltd. New De ISBN:9788174767295
  2. Chakraborti,M. Estimating and costing, specification and valuation in civil engineering Monojit Chakraborti, Kolkata (2006) ISBN-10 818530436X ISBN-13: 978-8185304366
  3. Patil, B.S. Civil Engineering Contracts and Estimates Orient Longman, Mumbai, Ed.2010 ISBN: 9788173715594, 8173715599
  4. Rangwala,S.C. Valuation of Real Properties Charotar Publishing House Pvt. Limited (2008 ISBN:9788185594774, 8185594775
  5. Birdie,G.S. Estimating and Costing Dhanpat Rai Publishing Company(P) Ltd.NewDelhi110002 ISBN : 978-93-84378-1

Learning Websites

  1. https://mjp.maharashtra.gov.in/schedule-rate-dsr/ Schedule Rate (DSR) Maharashtra Je Pradhikaran
  2. https://mjp.maharashtra.gov.in/schedule-rate-dsr/ CPWD in house codes, manuals, schedules, technical specifications, de manuals and technical publications.
  3. https://www.microsoft.com/en-in/microsoft-365/excel Microsoft Excel 365 open source soft
  4. https://www.youtube.com/watch?v=IoBd5UhGifs Full Building Estimation in Excel she
  5. https://youtube.com/playlist? list=PLMCExauCXvoOGL3nP49ee_-Ua tf1PAJ8q&si=N4gNlyNL3PzLvRTx Estimating, Costing and Valuation
  6. https://www.youtube.com/watch?v=iry2zEoPvsU Sinking Fund / Book Value / Scrap Va Market Value / Salvage Value / Valuat
  7. https://www.youtube.com/watch?v=C6O09yOa45c Rate Analysis Of Civil Work | How to Prepare Rate Analysis | Rate Analysis 1000 sqft house plan
  8. https://www.youtube.com/watch?v=H5qIwRCOFn4&list=PLv20kpHlal H1zD-oueYjooR-KdO6q_NLa&index=4 Administrative approval, Technical sanction and Budget provision
  9. https://www.youtube.com/watch?v=ZAnIaZIMGtw&list=PLv20kpHlal H1zD-oueYjooR-KdO6q_NLa&index=5 Types of estimates – Approximate esti and Detailed estimate
  10. https://www.youtube.com/watch?v=-BRwUs27ByY Valuation of a Property / What is the purpose of Valuation / What factors affecting Valuation
  11. http://acl.digimat.in/nptel/courses/video/124105015/lec40.pd f Rebar Detailing

For detail Syllabus of all other subjects of Construction Technology, K scheme do visit Construction Technology 4th Sem Syllabus for K scheme.

For all Construction Technology results, visit MSBTE Construction Technology all semester results direct links.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.