Surveying detailed Syllabus for Civil & Environmental Engineering (LE), K scheme PDF has been taken from the MSBTE official website and presented for the diploma students. For Subject Code, Subject Name, Lectures, Tutorial, Practical/Drawing, Credits, Theory (Max & Min) Marks, Practical (Max & Min) Marks, Total Marks, and other information, do visit full semester subjects post given below.
For all other MSBTE Civil & Environmental Engineering 2nd Sem K Scheme Syllabus PDF, do visit MSBTE Civil & Environmental Engineering 2nd Sem K Scheme Syllabus PDF Subjects. The detailed Syllabus for surveying is as follows.
Rationale
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Course Outcomes:
Students will be able to achieve & demonstrate the following COs on completion of course based learning
- Suggest relevant type of survey required for the given situation.
- Undertake cross staff and compass survey for the given field
- Undertake survey using Theodolite for preparing a plan of the given terrain.
- Determine Reduced Level to prepare Contour maps for the given type of terrain
- Prepare the plan using Plane Table Surveying to locate relevant details.
Unit I
Overview and Classification of Surveying 1.1 Surveying: Introduction, Purpose, use and Principles. 1.2 Types of surveying- Primary and Secondary classification, Plane, Geodetic, Cadastral, Hydrographic, Photogrammetry Aerial, Layout survey, Control survey, Topographical survey, Route survey, Reconnaissance survey. 1.3 Conventional sign and symbols
Suggested Learning Pedagogy
Demonstration Assignment Video Demonstrations Chalk-Board Presentations
Unit II
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Unit III
Theodolite Surveying 3.1 Types and uses of Theodolite; Component parts of transit Theodolite and their functions, Reading the Vernier of transit Theodolite 3.2 Technical terms- Swinging, Transiting, Face left, Face right 3.3 Fundamental axes of transit Theodolite and their relationship 3.4 Temporary adjustment of transit Theodolite 3.5 Measurement of horizontal angle-Direct and Repetition method, Errors eliminated by method of repetition 3.6 Measurement of vertical Angle 3.7 Theodolite traversing by included angle method and deflection angle method 3.8 Checks for open and closed traverse, Calculations of bearing from angles 3.9 Traverse computation-Latitude, Departure, Consecutive coordinates, independent coordinates, Balancing the traverse by Bowditch’s rule and Transit rule, Gale’s Traverse table computation
Suggested Learning Pedagogy Model Demonstration Chalk-Board Hands-on Collaborative learning Video Demonstrations Site/Industry Visit Case Study Demonstration Presentations
Unit IV
Levelling and Contouring 4.1 Terminologies: Level surfaces, level line, Horizontal and vertical surfaces, Datum, Bench Marks- GTS, Permanent, Arbitrary and Temporary, Reduced Level, Line of collimation, Back sight, Fore sight, intermediate sight, Change point, Height of instruments 4.2 Types of levels: Dumpy, Auto level, Digital level, Fundamental axis of Dumpy Level . Temporary adjustments of Level. 4.3 Types of Levelling Staffs: Self-reading staff and Target staff. 4.4 Reduced level by Plane of collimation method and Rise/ Fall Method 4.5 Fnd the R. L. by H.I. method with necessary checks (Numerical problems) 4.6 Find the R.L by Rise and Fall method with necessary checks. (Numerical problems) 4.7 Types of Leveling : Simple, Differential, Fly, Profile and Reciprocal Levelling 4.8 Contour, contour interval, horizontal equivalent. 4.9 Contour maps: Characteristics and uses of Contour maps 4.10 Methods of Locating Contour: Direct and Indirect
Suggested Learning Pedagogy
Model Demonstration Video Demonstrations Chalk-Board Hands-on Collaborative learning Presentations Demonstration Case Study
Unit V
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Pratical / Tutorial Experiences
- Measure the distance between two intervisible survey stations using chain, tape and ranging rods.
- Determine area of open field using chain and cross staff survey.
- Determine area of irregular field using Digital Planimeter
- Measure Fore Bearing and Back Bearing of survey lines of open traverse using Prismatic Compass
- Measure Fore Bearing and back bearing of a closed traverse of 5 to 6 sides and correct the bearings and included angles.
- Measure Horizontal angle by using Transit Theodolite by Direct Method
- Measure Horizontal angle by using Transit Theodolite by method of Repetition
- Measure vertical angle using Transit Theodolite
- Use transit theodolite to carry out Survey Project for closed traverse for minimum 5 sides (Compulsory). 6
- Determine Reduced Level by Height of Instrument Method
- Determine Reduced Level by Rise and Fall Method
- Perform Fly Levelling to check levelling work
- Profile leveling and cross-sectioning for a road length of 300 m with cross-section at 20 m interval. (Compulsory).
- Undertake differential leveling by using dumpy level/Auto Level and leveling staff for Installation of irrigation pipelines
- Prepare Contour Plan/map using Block Contouring for the area of 40m x 40m to draw its contour plan
- Plotting contour map using block contouring method for a block of 150m x 150m with grid of 10m x 10m for given land parcel. (Compulsory).
- Prepare Contour plan for control farming using block contouring method
- Prepare plans and locate details by using Radiation Method.
- Prepare plans and locate details by Intersection Method
- Prepare traverse using Plane table Surveying
- Prepare plan to establish plant nursery
Suggested Micro Project / Self Learning
Micro project
- Collect the contour maps of different terrains available with various authorities & prepare a report on its interpretation.
- Determine the RLs of the components of existing structures like Plinth, lintels, chajja, slab, and beam etc
- Collect the information of survey instruments available in the market with their specifications.
- Prepare a flex chart to explain one method of plane tabling.
- Compare Traversing with plane table and compass method
- Perform reconnaissance survey for plotting the alignment of road.
- Observe Topographical maps and interpret the details
- Carry out comparative study of following survey instruments of different make and brands : Auto level and Dumpy Level
- Collect the map of city /town and calculate the ward wise and total area using digital planimeter.
Assignment
- Explain one method each to measure the distance between points on either side of obstacles in case of following: River, Lake, Building.
- Set the alignment of proposed road using Theodolite
- Interpret the given contour maps.
- Draw the representative contour maps for the following: Ridge of a mountain, Hillock, Valley, Pond/lake, Gentle slope, Very Steep Slope, Plain Surface
- Determine the reservoir capacity from a give contour map of reservoir.
- Measure area of small open ground by plane tabling.
- Measure the height of the flag post using Theodolite.
- Determine the reservoir capacity from a give contour map of reservoir.
Laboratory Equipment/Software Required
For the complete Syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier..
Suggested Learning Materials
- Kanetkar T. P.; Kulkarni, S. V. Surveying and Levelling volume I Pune Vidyarthi Gruh Prakashan, Pune; ISBN:978-81-858-2511-3
- Basak, N. N. Surveying and Levelling McGraw Hill Education, New Delhi ISBN 93-3290-153-8
- S. K. Duggal Survey I McGraw Hill Education, New Delhi, ISBN: 978-00-701-5137-6
- Punmia, B.C, Jain, Ashok Kumar Jain, Arun Kumar Surveying I Laxmi Publications., New Delhi. ISBN: 817-008853-4
- Bhavikatti, S. S. Surveying and Levelling, Volume 1 I. K. International, New Delhi ISBN: 97881-906-9420-9
Learning Websites & Portals
- https://archive.nptel.ac.in/courses/105/104/105104101/ Introduction to Surveying, Principles of surveying, and Classification of Surveying
- https://lnct.ac.in/wp-content/uploads/2020/03/Unit-4B.pdf Theodolite Surveying
- https://www.slideshare.net/gauravhtandon1/plane-table-survey -27614680 Plane Table Surveying-accessories and methods
- http://www.pkace.org/Lecture_Notes/Survey-lecture notes.pdf Levelling-methods of levelling and types of levels
- https://dspmuranchi.ac.in/pdf/Blog/Survey.pdf Surveying and Levelling
- https://civilplanets.com/compass-surveying/ Compass Surveying and its types, Temporary adjustmments
- http://ecoursesonline.iasri.res.in/mod/page/view.php? id=1282 85 Traversing by Prismatic Compass, WCB and RB conversion and Terms in Compass Surveying
- https://www.youtube.com/watch?v=x9ZPMxrlS3U Measurement of bearing by prismatic compass
- https://youtu.be/j8poe2vvD2Q Temporary adjustment of auto level
- https://www.youtube.com/watch?v=c9U0xlmCzGI Temporary adjustment of Transit Theodolite
- https://youtu.be/L54T4uvpMTg Levelling operation by using Dumpy Level
- https://www.youtube.com/watch?v=boPrQFZEn9A Radiation method by plane table surveying
- https://www.youtube.com/watch?v=PQfr1LABZWg Contouring and its characteristics, Methods of Contouring
- https://www.youtube.com/watch?v=-mkf7uJG8DI Intersection method of Plane Table Surveying
- https://theconstructor.org/surveying/chain-survey/29812/ Chain, Tapes and other linear measurement equipments
For detail Syllabus of all other subjects of Civil & Environmental Engineering, K scheme do visit Civil & Environmental Engineering 2nd Sem Syllabus for K scheme.
For all Civil & Environmental Engineering results, visit MSBTE Civil & Environmental Engineering all semester results direct links.