Electrical Estimating and Costing detailed syllabus for Electrical & Electronics Engineering (EEE) for 2015 revision curriculum has been taken from the SITTTRs official website and presented for the EEE students. For course code, course name, number of credits for a course and other scheme related information, do visit full semester subjects post given below.

For Electrical & Electronics Engineering 4th Sem scheme and its subjects, do visit EEE 4th Sem 2015 revision scheme. The detailed syllabus of electrical estimating and costing is as follows.

Electrical Estimating and Costing

Course Outcomes:

For the complete syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

Specific Outcome:

MODULE I: Wiring Accessories and Illumination Engineering

  1. To describe the specifications of various wiring accessories.
  2. To differentiate various types of wires and cables.
  3. To state the laws of illumination.
  4. To define different terms related to illumination.
  5. To identify various lighting schemes – Direct, indirect, semi direct and semi indirect.
  6. To determine illumination levels required at various poles.
  7. To define the terms used for design of lighting schemes:
    1. Space to Height ratio.
    2. Depreciation Factor.
    3. Maintenance Factor.
    4. Utilization Factor.
  8. To deduce different methods of lighting calculation watt per square meter method.
  9. To compute number of lamps required to illuminate various types of rooms, halls etc.
  10. To draw the lighting arrangements.
  11. To comprehend the operation of gas filled lamps and halogen lamps.
  12. To comprehend the operation of arc lamps and CFL.
  13. To comprehend the operation of sodium vapour lamps.
  14. To comprehend the operation of Mercury vapour lamp.
  15. To comprehend the operation of neon lamp and fluorescent lamps.

MODULE II: Estimation of Domestic Installation

  1. To comprehend various wiring system used in domestic wiring.
  2. To comprehend the general IS codes regarding internal wiring.
  3. To compute the conductor size and the procedure for determines the size.
  4. To define the circuits and sub circuits.
  5. To draw the layout of wiring.
  6. To describe the preparation of the estimate and cost of materials used for internal wiring of different buildings in surface conduit system.
  7. To describe the preparation of the estimate and cost of materials used for internal wiring of different buildings in concealed system.
  8. To compute simple problems.

MODULE III: Estimation of Industrial Installations

  1. To describe the purpose of earthing
  2. To Know various types of earthing
  3. To Know IE rules regarding earthing systems.
  4. To prepare the estimate and cost of materials used for a standard pipe earthing
  5. To prepare the estimate and cost of materials used for a standard and plate earthing.
  6. To prepare the estimate of wiring materials and cost of wiring for single phase and 3 phase supplies.
    1. Domestic pump set.
    2. Irrigation pump set etc.
  7. To prepare the estimate and cost of materials for the control panel.
  8. To prepare the estimate and cost of wiring small workshop with the given capacity of machines
  9. To know the industrial bus-bar system
  10. To prepare the estimate and cost of materials required for giving single phase service connection without extension of Overhead lines.
  11. To prepare the estimate and cost of materials for 3 phase service connection from the existing lines.
  12. To prepare the estimate and cost of materials used for service connection using underground cables.
    1. Single phase.
    2. Three phase.

MODULE IV: Estimation of Substations

  1. To prepare the estimate of various materials used for distribution lines.
  2. To prepare the estimate and cost of materials for extending single phase OH distribution line
  3. To prepare the estimate and cost of materials for extending 3 Phase OH distribution line
  4. To explain how to prepare an estimate and cost of materials for street lighting using overhead Cables.
  5. To explain how to prepare estimates and the cost of materials for street lighting using UG cables.
  6. To prepare the estimate and the cost of materials for extending an existing 11 kV Overhead line
  7. To Study various components of pole materials and substation and their costs
  8. To study IS Codes.

MODULE I

For the complete syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

MODULE II

Relevant rules- mention IS 732-IS 3043-various wiring methods as per IS 732.- Relevant sections of CEA regulations 2010 regarding internal wiring. Classification of Circuits-Light and Power circuits. Sub circuits- light sub circuit- power sub circuits. Capacity of sub circuits. Switch boards-Main switch board-sub switch board-Distribution board-Function -classification- specification. Selection of cables for internal wiring-cable size calculation-simple problems. Selection criteria for of control switches-main switch. Selection criteria for protective gears-RCCB-MCB-fuse. Co-ordination between fuses or MCBs at different circuit levels- size of earth continuity conductor and earthling conductor. Preparation of schematic diagrams and wiring diagrams-Single line and multiline. Standard estimation format-mention use of estimation software. Estimation problems regarding Electrification of domestic buildings. High rise building definition -relevant rules regarding electrification of high rise buildings.

MODULE III

For the complete syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

MODULE IV

Over head line construction- Relevant sections of CEA regulations 2010 regarding overhead line construction-materials-specifications -classification-AAC-AAAC-ACSR-Size and rating of line conductors-insulators-Pin-shackle-disc-supporting poles- stays-anchor stay-strut pole stay-earthing of line structures, estimation problems regarding the extension of single phase and three phase distribution lines with and without street light- estimation problems regarding the extension of 11kV lines. Substation- definition-classification-11kV substation- pole mounted – plinth mounted-components-substation earthing-layout.

Reference Books:

For the complete syllabus, results, class timetable, and many other features kindly download the iStudy App
It is a lightweight, easy to use, no images, and no pdfs platform to make students’s lives easier.
Get it on Google Play.

For detailed syllabus of all other subjects of Electrical & Electronics Engineering, 2015 revision curriculum do visit EEE 4th Sem subject syllabuses for 2015 revision.

To see the syllabus of all other branches of diploma 2015 revision curriculum do visit all branches of SITTTR diploma 2015 revision.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.