Syllabus

JNTUK B.Tech Project Work for R13 Batch.

JNTUK B.Tech Project Work gives you detail information of Project Work R13 syllabus It will be help full to understand you complete curriculum of the year.

Learning Objectives: The students are guided to learn the following aspects:

  • Understanding & evaluating the usage / commercial /environmental aspect of a Petroleum Product / process from a demand / supply or regulation point of view.
  • Understanding & evaluating the technology aspects of various alternatives available, called “Best Available Technologies (BAT)”, through literature & references and select a suitable process with optimum capacity.
  • Carrying-out the basic design of the process using steady state simulation and generate PFD heat & material balance and utility consumption summary.
  • Preparing Material Selection drawing based on 20 year equipment life. Carrying-out preliminary equipment design, with mechanical details, of all major equipment and preparing equipment data sheets.
  • Preparation of Equipment Layout & Plot Plan drawing.
  • Preliminary cost estimation of the plant (CAPEX) and OPEX via utility / chemical / catalyst consumption.
  • Presentation & Project management skills.

The project work may consist of any one of the following:
a) The project work should consist of a comprehensive design project of one of the Petroleum
Refinery Units/ a Petrochemical plant in the form of a report with the following chapters:

  1. Introduction
  2. Physical and chemical properties and uses
  3. Literature survey for different processes
  4. Selection of the process
  5. Material and energy balances
  6. Specific equipment design, (Process as well as mechanical design with drawing), including computer programs wherever possible, of heat transfer equipments or separation equipments or reactors
  7. General equipment specifications
  8. Plant location and layout
  9. Materials of construction
  10. Health and safety factors
  11. Preliminary cost estimation
  12. Bibliography.

b) Modeling & Simulation of any petroleum refining unit/petrochemical process.
c) Any experimental work with physical interpretations.

Outcomes: The student shall be able to independently carryout the following tasks

  • Preparation of Project Feasibility Reports for Petroleum /Petrochemical Plants.
  • Gather & use various sources such as market data, literature, customer feed-backs etc. to evaluate the Best Available Technologies in the market and select suitable process meeting the site conditions, environmental regulations, product quality etc.
  • Simulation of Overall Plant including estimation utility consumptions.
  • Generation of PFD (Process Flow Diagrams), MSD (Material Selection Diagrams) and Heat & material balance reports.
  • Sizing of all plant equipment and preliminary cost estimation using cost indexes, charts& literature.
  • Preliminary cost estimation of piping, instrumentation, electrical equipment, civil works & construction as % of Equipment cost, to determine Installation cost of the plant.
  • Preliminary utility, catalyst & chemical consumption estimation and using this data estimating the operating cost.
  • Manage a comprehensive project in a planned manner, within specified time and present the salient features of the result to the audience with confidence and clarity.

For more information about all JNTU updates please stay connected to us on FB and don’t hesitate to ask any questions in the comment.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.