M.Tech, Syllabus

JNTUH M.Tech 2017-2018 (R17) Detailed Syllabus Power Plant Erection

Power Plant Erection Detailed Syllabus for Power Plant Engineering and Energy Management M.Tech first year first sem is covered here. This gives the details about credits, number of hours and other details along with reference books for the course.

The detailed syllabus for Power Plant Erection M.Tech 2017-2018 (R17) first year first sem is as follows.

M.Tech. I Year I Sem.

UNIT- I : Preparation of commissioning, trial run of various equipments, commissioning of valves, air and gas tightness test of boiler. Chemical cleaning boiler, preparation for boiler light up, thermal flow test of water walls and economizers, steam blowing.

UNIT- II : Safety valves setting, reliable run of boiler. Hydraulic test of boiler. Alkaline flushing and commissioning of regenerative system, acid cleaning of oil pipe lines, oil flushing procedure of lubricating oil and governing system.
Turbine Lubricating oil flow testing steam blowing, reheater safety valve, vacuum tightness test, ejector testing.

UNIT- III : Commissioning of governing system and ATRS & ATT, and TSE. Commissioning of generator and
auxiliaries (Generator testing, rotor and stator cooling system, excitation system)Commissioning of electrical system (Circuit breakers, isolators, CT and PT, rectifiers, switchgear, DC System).C&I Commissioning activities (Minimum instrumentations required for major C&I commissioning, commissioning of control valve, tuning of control valves). Discussion/Appraisal.

UNIT- IV : Availability of electrical supply to the equipment (source feeder of each equipment, points of isolationm of the equipment, locking during isolation, permit to work system). Boiler pre light up checks. (Meaning of light up, shut down, tripping, starting etc.,l No pending permits, local checks). Operation of service auxiliaries (cooling water pump, compressors, auxiliary steam, fuel oil pump). Operation of air-pre heater and ID fan )(Rechecks, flow path line up, permissives, interlocks).

UNIT- V : Operation of FD & PA Fans (pre checks, flow path line up permissives, interlocks). Mill operation (pre checks, flow path line up, permissives, interlocks). FSSS (Secondary air, burner tilt, fuel and air control). Drum level control, Super Heater, Re-Heater, temperature control and their interlocks. Operation of turbine lubricating system and barring gear. Operation of condensate and feed water system (BFP, Heaters CEP). HP/LP Bypass operation and turbine heating. Turbine rolling and synchronization. Operation of generator cooling system (stator and hydrogen cooling). Operation of Generator excitation system AVR. Operation of Turbine governing system. Integrated operation of unit (unit loading and shut down sequence) Operational difference between cold start up, warm start up and hot start up. Load dispatching and coordination with load dispatch center.

REFERENCES:

  • Power plant operation/ NPTI Publication
  • Power Plant Engineering/P.K. Nag/TMH
  • CEGB Manual on power Plant Operation

For all other M.Tech 1st Year 1st Sem syllabus go to JNTUH M.Tech Power Plant Engineering and Energy Management 1st Year 1st Sem Course Structure for (R17) Batch.

All details and yearly new syllabus will be updated here time to time. Subscribe, like us on facebook and follow us on google plus for all updates.

Do share with friends and in case of questions please feel free drop a comment.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.