Muzeeb Khan PatanMember TARGET THE GATE 2012 FOR TRANSFORMING CARRER =_=_=_=_=_=_=_=_=_=_=_=_=_=_=_=_ The Companies BHEL: 175 Electrical Engineer Trainees Indian Oil: 45 Electrical Engineer Trainees Apporx. POWERGRID: 86 Electrical Engineer Trainees Apporx. NTPC: 110 Graduate Electrical Engineer Trainees Apporx. ======================= Total of 400 Posts for Electricals Only. =======================
TARGET THE GATE 2012 FOR TRANSFORMING CARRER
=_=_=_=_=_=_=_=_=_=_=_=_=_=_=_=_
The Companies
BHEL: 175 Electrical Engineer Trainees
Indian Oil: 45 Electrical Engineer Trainees
Apporx.
POWERGRID: 86 Electrical Engineer Trainees
Apporx.
NTPC: 110 Graduate Electrical Engineer Trainees
Apporx.
=======================
Total of 400 Posts for Electricals Only.
=======================