{"id":756,"date":"2016-11-11T13:37:14","date_gmt":"2016-11-11T13:37:14","guid":{"rendered":"http:\/\/www.inspirenignite.com\/anna-university\/?p=756"},"modified":"2019-07-17T08:55:54","modified_gmt":"2019-07-17T08:55:54","slug":"anna-university-b-tech-ce-r13-7th-sem-estimation-quantity-surveying-syllabus","status":"publish","type":"post","link":"https:\/\/www.inspirenignite.com\/anna-university\/anna-university-b-tech-ce-r13-7th-sem-estimation-quantity-surveying-syllabus\/","title":{"rendered":"Anna University B.Tech CE (R13) 7th Sem Estimation and Quantity Surveying Detailed Syllabus"},"content":{"rendered":"<p>Estimation and Quantity Surveying Syllabus for B.Tech 7th sem is covered here. This gives the details about credits, number of hours and other details along with reference books for the course.<\/p>\n<p>The detailed syllabus for Estimation and Quantity Surveying B.Tech (R13) seventhsem is as follows<\/p>\n<p><strong>OBJECTIVES:<\/strong><\/p>\n<p>To provide the student with the ability to estimate the quantities of item of works involved in\u00a0buildings, water supply and sanitary works, road works and irrigation works, and also to\u00a0equip the student with the ability to do rate analysis, valuation of properties and preparation\u00a0of reports for estimation of various items.<\/p>\n<p><strong>UNIT I : ESTIMATE OF BUILDINGS \u00a0<\/strong> \u00a0 \u00a0 \u00a0 [11 hours]<br \/>\nLoad bearing and framed structures \u2013 Calculation of quantities of brick work, RCC, PCC,\u00a0Plastering, white washing, colour washing and painting \/ varnishing for shops, rooms, residential\u00a0building with flat and pitched roof \u2013 Various types of arches \u2013 Calculation of brick work and RCC\u00a0works in arches \u2013 Estimate of joineries for panelled and glazed doors, windows, ventilators,\u00a0handrails etc.<\/p>\n<p><strong>UNIT II : ESTIMATE OF OTHER STRUCTURES<\/strong> \u00a0 \u00a0 \u00a0 \u00a0\u00a0[10 hours]<br \/>\nEstimating of septic tank, soak pit \u2013 sanitary and water supply installations \u2013 water supply pipe line\u00a0\u2013 sewer line \u2013 tube well \u2013 open well \u2013 estimate of bituminous and cement concrete roads \u2013\u00a0estimate of retaining walls \u2013 culverts \u2013 estimating of irrigation works \u2013 aqueduct, syphon, fall.<\/p>\n<p><strong>UNIT III : SPECIFICATION AND TENDERS<\/strong> \u00a0 \u00a0 \u00a0\u00a0[8 hours]<br \/>\nData \u2013 Schedule of rates \u2013 Analysis of rates \u2013 Specifications \u2013 sources \u2013 Preparation of detailed\u00a0and general specifications \u2013 Tenders \u2013 TTT Act \u2013 e-tender \u2013 Preparation of Tender Notice and\u00a0Document \u2013 Contracts \u2013 Types of contracts \u2013 Drafting of contract documents \u2013 Arbitration and\u00a0legal requirements.<\/p>\n<p style=\"text-align: center\"><strong><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\" target=\"_blank\" rel=\"noopener\">Download iStudy<\/a> <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\" target=\"_blank\" rel=\"noopener\">Android<\/a><a href=\"https:\/\/play.google.com\/store\/apps\/details?id=ini.istudy\" target=\"_blank\" rel=\"noopener\"> App for complete Anna University syllabus, results, timetables and all other updates. There are no ads and no pdfs and will make your life way easier.<\/a><\/strong><\/p>\n<p><strong>[TOTAL : 45 PERIODS]<\/strong><\/p>\n<p><strong>OUTCOMES:<\/strong><\/p>\n<p>The student shall be able to estimate the material quantities, prepare a bill of quantities,\u00a0make specifications and prepare tender documents. Student shall be able to prepare value\u00a0estimates.<\/p>\n<p><strong>TEXTBOOKS:<\/strong><\/p>\n<ul>\n<li>Dutta, B.N., \u201cEstimating and Costing in Civil Engineering\u201d, UBS Publishers &amp; Distributors\u00a0Pvt. Ltd., 2003<\/li>\n<li>Kohli, D.D and Kohli, R.C., \u201cA Text Book of Estimating and Costing (Civil)\u201d, S.Chand &amp;\u00a0Company Ltd., 2004<\/li>\n<\/ul>\n<p><strong>REFERENCES:<\/strong><\/p>\n<ul>\n<li>PWD Data Book.<\/li>\n<li>Tamilnadu Transparencies in Tender Act, 1998<\/li>\n<li>Arbitration and Conciliation Act, 1996<\/li>\n<li>Standard Bid Evaluation Form, Procurement of Goods or Works, The World Bank, April\u00a01996.<\/li>\n<\/ul>\n<p>For all other B.Tech CE 7th sem syllabus go to <a href=\"http:\/\/www.inspirenignite.com\/anna-university\/anna-university-b-tech-civil-engineering-7th-sem-course-structure-for-r13-batch\/\">Anna University B.Tech CIVIL Engineering (CE) 7th Sem Course Structure for (R13) Batch<\/a>.All details and yearly new syllabus will be updated here time to time. Subscribe, like us on facebook and follow us on google plus for all updates.<\/p>\n<p>Do share with friends and in case of questions please feel free drop a comment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estimation and Quantity Surveying Syllabus for B.Tech 7th sem is covered here. This gives the details about credits, number of hours and other details along with reference books for the [&hellip;]<\/p>\n","protected":false},"author":2259,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-756","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/posts\/756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/users\/2259"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/comments?post=756"}],"version-history":[{"count":3,"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/posts\/756\/revisions"}],"predecessor-version":[{"id":10754,"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/posts\/756\/revisions\/10754"}],"wp:attachment":[{"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/media?parent=756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/categories?post=756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inspirenignite.com\/anna-university\/wp-json\/wp\/v2\/tags?post=756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}